Where storms win
Four places we check first
Roof uplift
On roofs in Sint Maarten, edge and corner zones carry much more suction than the middle.
Large openings
A failed door or window pressurizes the building; we design for it.
Hillside speed-up
Ridges and steep slopes raise wind loads; your engineer sets the topographic factor.
Lagoon and pond surge
Low ground around the lagoon and the salt pond floods in storms.
By area
How the area changes the loads on your steel
Your engineer of record confirms the values for each site.
| Area | What changes |
|---|---|
| Maho, Cupecoy and the Lowlands | Open sea exposure and beachfront surge |
| Simpson Bay Lagoon | Low ground, surge and spray at the marinas |
| Cole Bay and Cul de Sac hills | Steep slopes that speed up the wind |
| Philipsburg and the Great Salt Pond | Low town on a sand bar, surge from Great Bay |
| Dutch Quarter and the east coast | Open Atlantic exposure |
Shelters
Buildings that shelter people
Schools and halls
Many serve as hurricane shelters and need a higher risk category.
Protected openings
Doors, shutters and glazing designed with the frame.
Back-up power
Steel supports for generators and water tanks sized for storm loads.
Sint Maarten
What we do not claim
We do not publish wind ratings or certify buildings in Sint Maarten for a hurricane category. The design is checked by your engineer of record for the loads set for your site in Sint Maarten.
Products and solutions
The World Steel pages behind this guide
Area by area
How this applies in your area
Sint Maarten has 5 areas. Open Philipsburg, Dutch Quarter and the east or Simpson Bay and the Lowlands to see the local wind, ground and coast, the road from Pointe Blanche and the steel we recommend there.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Sint Maarten project is cut, welded, inspected and packed.
Q&A
What St. Maartener buyers ask
What did Irma teach builders in Sint Maarten?
That roofs and openings fail first, that hillside sites see higher winds, and that a continuous load path from cladding to foundations keeps a building standing.
Is steel a good choice after Irma?
Yes. Steel frames are designed for reversing wind loads, go up fast and come complete from one plant, which helps an island rebuild quickly.
Do you supply roof and wall cladding too?
Yes. Roof and wall panels, purlins, girts and fixings can ship with the frame, designed for the same wind at your site in Sint Maarten.
Sint Maarten solutions
Every Sint Maarten guide
Related pages
Code facts on this page summarize practice in Sint Maarten and the standards it references. They are not legal or engineering advice; your engineer of record and VROMI confirm the code and edition in force for your project.
Contact World Steel · Sint Maarten
Talk to us about steel for Sint Maarten
WhatsApp, email or a video call with our engineers, booked at an hour that suits Philipsburg. Our contact page for Sint Maarten has the ports, the local time and the form.