Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Sint Maarten · Rebuilding and hotels

Steel for Sint Maarten rebuilding and hotels

Since Irma the country has rebuilt its airport terminal, schools, shelters, government buildings and thousands of roofs, many to stronger standards. Hotels and timeshare towers at Maho, Cupecoy, Simpson Bay and Dawn Beach keep renovating and adding rooms. Labour and laydown space are scarce and almost every material is imported. A steel frame made off site and shipped in erection order shortens the time on site.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped to Pointe Blanche.

Red multi-story process tower frame next to a feed mill
Process tower frame by World Steel in Vinh Long Province, Vietnam.
Airport
Simpson Bay
Public
Schools, shelters, government
Hotels
Maho to Dawn Beach
Capacity
2,500 t a month

Project types

What we fabricate for Sint Maarten

Schools and shelters

Classrooms and halls designed to the shelter risk category.

Airport buildings

Terminal, hangar and cargo frames.

Hotels and timeshare

Multi-storey frames for rooms, lobbies and restaurants.

Healthcare

Composite frames with stiff floors for equipment.

Government and offices

Composite floors released floor by floor.

Marina buildings

Boat sheds and marina buildings on the lagoon.

Speed

A small island, a big programme

We fabricate while your site builds the foundations, then ship building by building so tight sites never fill up with steel. Schools that must reopen for the term and hotels that must open for the season gain the most.

Large programmes are released by building or by phase. Our references include Sunpro Steel at 5,000 t, CPV Food at 2,500 t and the Long Son petrochemical complex at 2,000 t.

Who does what

Project work, split clearly

World Steel supplies

  • Steel design or detailing to the code basis agreed for Sint Maarten
  • Fabrication, coating and QC release
  • Composite deck, studs and secondary steel
  • Packing by building and shipping to Pointe Blanche
  • Shop and erection drawings, included

The contractor arranges

  • Owner contract and permits
  • Engineer of record approval
  • Foundations and anchor bolts
  • Erection and concrete topping
  • Finishes, services and fit-out

Products and solutions

The World Steel pages behind this guide

Area by area

How this applies in your area

Sint Maarten has 5 areas. Open Simpson Bay and the Lowlands, Cole Bay or Cul de Sac to see the local wind, ground and coast, the road from Pointe Blanche and the steel we recommend there.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Sint Maarten project is cut, welded, inspected and packed.

Multi-story steel frame rising next to a fabrication hall
Going up beside the plant in Vietnam: World Steel framed its own office building.
Crew assembling a large steel truss on the shop floor
A large truss being put together in the Vietnam fabrication hall.
Pair of red truss assemblies with bolted connection plates inside the shop
Two trusses finished in red primer at World Steel in Vietnam.
Finished columns with base plates resting on shop rails
Finished columns laid out for dimensional checks, World Steel, Vietnam.

Q&A

What St. Maartener buyers ask

Can you supply a programme of school and shelter buildings?

Yes. We release packages building by building from one plant, with one set of drawings and one tracking system.

Can a steel frame help a hotel reopen on time?

Yes. Members are made while foundations are built, and the frame goes up much faster than cast concrete.

Do you work with St. Maarten contractors?

Yes. Contractors in Sint Maarten are our customers: they win the work and erect it, and we design, fabricate and supply the steel.

Contact World Steel · Sint Maarten

Talk to us about steel for Sint Maarten

WhatsApp, email or a video call with our engineers, booked at an hour that suits Philipsburg. Our contact page for Sint Maarten has the ports, the local time and the form.