Quality · EPD and embodied carbon

Structural steel EPDs and embodied carbon, explained for US buyers

World Steel fabricates 2,500 metric tons of structural steel a month for large jobs, and more of those bids now ask for an Environmental Product Declaration. Our own EPD is in progress. This page explains what an EPD shows, who asks for one and what we can give you while ours is prepared.

World Steel EPD: In progress

World Steel does not hold an EPD yet. We are working toward one.

We are in the process of obtaining an Environmental Product Declaration for the structural steel we fabricate. Until it is verified and registered, we will not quote one, imply one or let an industry average stand in for it. When it is published, it will appear on this page.

How an EPD is made

The steps every EPD goes through before it can be used

These are the general steps for any product EPD under ISO 14025. A declaration only counts once the last two are done, which is why we do not quote ours yet.

  1. Plant dataA year of energy, material, scrap and waste records from the fabrication plant.
  2. Product category ruleThe PCR that sets how steel construction products are measured and reported.
  3. Life-cycle assessmentAn LCA to ISO 14040 and 14044 turns the records into impacts per metric ton.
  4. Independent verificationA third-party verifier checks the LCA and the draft declaration against the PCR.
  5. RegistrationA program operator registers the EPD and lists it publicly.
  6. Published hereThe registered EPD, its number and its validity dates go on this page.

What is an EPD

How to read an EPD for structural steel

An Environmental Product Declaration is a Type III declaration under ISO 14025: the results of a life-cycle assessment, reported to a product category rule, checked by an independent verifier and registered with a program operator. These are the fields a reviewer checks first.

How mill certificates are read
Field guide · not a World Steel EPD

Environmental Product Declaration

Fabricated structural steel · ISO 14025 · ISO 21930

Program operator
The body that registers the EPD, such as UL Solutions, ASTM International, NSF or SCS Global Services.You can look the declaration number up on the operator’s public list.
Product category rule
The PCR the study followed, under ISO 21930 in North America or EN 15804 in Europe.Two EPDs only compare fairly when they follow the same PCR.
Declared unit
For structural steel, usually 1 metric ton of fabricated product.Multiply by the tonnage in your takeoff to get the package total.
System boundary
Which life-cycle modules are counted. Steel EPDs are usually cradle to gate, A1 to A3.Shipping to your site, A4, is then counted separately by your LCA.
Global warming potential
GWP in kg CO2e per declared unit, the figure Buy Clean limits are set against.Check it against the limit in your contract, not against a brochure.
Type of EPD
Industry-wide, product-specific or facility-specific.Some contracts accept only facility-specific EPDs.
Verifier and validity
Who verified it, and the issue and expiry dates, usually five years apart.An expired EPD does not count on most submittals.

Where the carbon sits

Steel’s life cycle, module by module

EPDs and building LCAs split a product’s life into the same modules. A steel EPD usually covers A1 to A3, cradle to gate. Shipping and erection are counted by the project study, and end of life by the building’s own assessment.

  1. A1

    Raw material supply

    Ironmaking and steelmaking at the mill. For steel this is where most of the embodied carbon is made.

    In a steel EPD
  2. A2

    Transport to the plant

    Plate and sections moved from the mill to the fabricator.

    In a steel EPD
  3. A3

    Manufacturing

    Cutting, drilling, welding, blasting and coating in the fabrication plant.

    In a steel EPD
  4. A4

    Transport to site

    For our steel: inland haul, the sea voyage from Vietnam and delivery to your jobsite.

    Project study
  5. A5

    Construction

    Erection on site, which is the US contractor’s scope.

    Project study
  6. B1–B7

    Use stage

    Steel framing needs little in service beyond coating upkeep.

    Building assessment
  7. C1–C4

    End of life

    Deconstruction, transport and processing of the steel.

    Building assessment
  8. D

    Beyond the boundary

    Credits for steel recovered and recycled into new steel.

    Building assessment

Why US buyers ask

Four desks that put an EPD request in your steel package

On large US jobs the EPD request reaches the steel supplier from one of these places. Knowing which one tells you how strict it is.

  • Buy Clean on public work

    California’s Buy Clean act (2017) and Colorado’s (2021) include structural steel on state projects: EPDs are submitted and the GWP must sit under a set limit.

    Other states have their own Buy Clean laws or pilots, many starting with concrete.

  • LEED and green building

    LEED v4 and v4.1 award a materials credit for products with EPDs, and a product-specific, third-party verified EPD counts for more than an industry-wide one.

    A whole-building life-cycle assessment option uses the same data.

  • Owner carbon targets

    Developers, tech companies and manufacturers set embodied carbon targets for new buildings and ask the design team to report them.

    The structural frame is often one of the largest items in that report.

  • The GC’s procurement desk

    Large general contractors add EPD requests to bid packages so the owner’s report can be filled in from submittals.

    The request may be required at bid, required at award or only preferred.

Industry-wide, product-specific, facility-specific

Three kinds of EPD, and which one fits imported steel

The narrower the EPD, the closer it is to the steel you actually buy. Contracts and rating systems weigh them differently.

  • Industry-wide

    An average across many producers in one region. AISC publishes US industry-average EPDs for fabricated hot-rolled sections, plate and HSS.

    Describes US mills and fabricators, so it is not the right figure for steel made in Vietnam.

  • Product-specific

    One manufacturer’s product, from its own data, possibly averaged over several plants.

    Counts for more under LEED than an industry-wide EPD.

  • Facility-specific

    One product from one named plant, from that plant’s own records.

    The type Buy Clean California asks for. Check whose plant your contract means: the mill, the fabricator or both.

While our EPD is in progress

Steel data your LCA consultant can use today

None of this is an EPD. It is the record behind every World Steel package, and it lets your team build an embodied carbon estimate for the steel from real mills, tonnage and routes.

  • Material list by grade and heat

    The material list that ships with the erection drawings ties every member to its grade, heat number and mill certificate.

    Shop drawings and lists
  • Mill and country on every certificate

    Each EN 10204 3.1 certificate names the mill that made the heat, so your LCA consultant can match it to that mill’s own data.

    EN 10204 mill certificates
  • Where the steel comes from

    Plate and sections come mainly from Vietnamese mills, with Japanese, Korean, Indonesian or Thai steel when the specification calls for it.

    Steel materials and sources
  • Tonnage by member type

    Our takeoff or design gives the steel weight by member type, the quantity an LCA multiplies by the declared unit.

    Sample design report
  • Less steel in the first place

    Design optimization removes tonnage from the frame, and every ton not bought is a ton that never has to be made, coated or shipped.

    Design optimization
  • Ports for the sea leg

    The port of loading in Vietnam and the US port of discharge are named on the booking, so A4 can be modeled from the real route.

    Vietnam to USA shipping

Reading your specification

Three ways an EPD clause is written, and our answer to each

Send us the clause with the bid documents. We answer it in writing before you carry our number.

  • “Submit a facility-specific, third-party verified EPD for structural steel with the bid. GWP shall not exceed the contract limit.”
    Cannot meet yet

    We cannot meet this clause until our EPD is published. Tell us at bid and we will say so plainly, before you carry our number.

  • “Provide EPDs where available. Report embodied carbon data for the structural steel package.”
    Steel data supplied

    We give the tonnage by member type with the quote, then the material list by heat with the mill on each certificate as the steel is bought, so your consultant can model the package.

  • “Contractor to pursue the LEED EPD credit. Products with EPDs preferred.”
    We check the mills

    Our steel does not count toward that credit yet. Ask us whether the mills behind your heats publish their own EPDs, and we will check before we quote.

Questions from US buyers

What contractors ask us about EPDs and embodied carbon

Does World Steel have an EPD for its structural steel?

Not yet. World Steel is in the process of obtaining an EPD for the structural steel it fabricates. We do not quote, imply or substitute one in the meantime. When it is verified and registered, it will be published on this page with its declaration number and validity dates.

What is an EPD for structural steel?

An Environmental Product Declaration is a Type III declaration under ISO 14025. It reports the results of a life-cycle assessment of a product, such as global warming potential in kg CO2e per metric ton, following a product category rule. It is checked by an independent verifier and registered with a program operator, and it is usually valid for five years.

Can I use an AISC industry-average EPD for steel fabricated in Vietnam?

It is not the right figure. AISC’s industry-wide EPDs describe steel produced and fabricated in the United States. Steel made from different mills and processes can carry a different footprint, so a project LCA for imported steel should use data for the actual mills and plant, or say clearly what it assumed.

Can World Steel bid on a Buy Clean California project?

Where the contract requires a facility-specific EPD for structural steel at bid or award, we cannot meet that requirement until our EPD is published. Tell us the clause when you send the bid documents and we will tell you plainly whether we can take part, before you carry our number.

Where does most of the embodied carbon in structural steel come from?

From making the steel at the mill, module A1. Fabrication, module A3, adds cutting, welding, blasting and coating, but on most steel EPDs it is a smaller share. That is why the mill behind each heat, and its steelmaking route, matters so much in an embodied carbon study.

Is shipping from Vietnam included in a steel EPD?

Usually not. Steel EPDs are mostly cradle to gate, modules A1 to A3. Transport to the jobsite is module A4, which the project’s life-cycle assessment models from the real route. We give you the port of loading and the port of discharge from the booking for that.

What carbon data can World Steel give my team today?

The material list by grade and heat number with its mill certificates, the mill and country of each heat, the steel tonnage by member type and the shipping route. Together they let your LCA consultant build an embodied carbon estimate for the steel package before our own EPD is available.

How can we lower the embodied carbon of the steel frame now?

Use less steel. Design optimization of the frame, members and connections removes tonnage, and every ton removed is carbon that is never made, coated or shipped. Ask us to optimize the design when you send the drawings.

Will you tell us when the EPD is published?

Yes. Ask for it when you send a project or a question, and we will send you the declaration as soon as it is registered.

Quality program EN 10204 mill certificates Steel materials and sources Accredited testing labs

Send the EPD clause with your bid

Send the bid documents and the sustainability section of the specification. We answer the EPD clause in writing and quote the steel with its tonnage by member type.