Site conditions in Cataño
What the site asks of your steel
- Wind
- Hurricanes from the Atlantic
- Flood
- Rivers, lagoons and surge
- Seismic
- Puerto Rico Trench to the north
- Air
- Salt near the coast
Our design note. Cataño needs plant buildings, terminal and tank supports and harbour buildings on soft bay ground. Galvanizing and foundations for fill shape the job.
Cataño at a glance
The ground, the work and the road in
Cataño is the smallest municipality of Puerto Rico by land area and home to the Bacardí distillery at Palo Seco. Bay-front sites sit on fill with a high water table and constant salt air.
Ground and climate
Bay sand and fill, high water table.
What gets built
Industry, fuel terminals, port services and the bay ferry.
Getting steel there
Cataño faces the port across San Juan Bay; trucks go round by PR-5, PR-165 and PR-888 in a few minutes.
Towns: Cataño · Palo Seco
Steel we recommend
What we fabricate for Cataño
The three building types we are asked for most here, made in our own plant in Vietnam and shipped in erection order.
Plants and process buildings
Process buildings, crane bays, mezzanines and pipe racks for manufacturing plants.
Manufacturing plants and crane bays →Energy and utilities
Power plant buildings, substations, solar canopies, tank and pipe supports.
Energy and power utilities →Marinas and marine buildings
Marina buildings, dry-stack boat sheds, ferry and harbour buildings.
Coastal corrosion protection →Contractors in Cataño
You win the job in Cataño. We fabricate the steel.
Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.
Q&A
Questions about steel in Cataño
Can you supply pipe racks and tank supports?
Yes. Pipe racks, platforms and tank supports, galvanized or coated for the harbour.
Which port serves Cataño?
Cataño is minutes from the terminals. For bay-front tank supports and pipe racks we specify a marine coating system or galvanizing from the start.
San Juan metro
Other municipalities: san juan metro
San Juan, Bayamón, Carolina, Guaynabo, Cataño, Toa Baja, Toa Alta, Trujillo Alto and Dorado: the capital, the main port, the airport and most offices, hospitals and warehouses.
Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the code basis in force in Puerto Rico. World Steel designs and fabricates the steel; the contractor erects it.
Contact World Steel · Puerto Rico
Talk to us about steel for Cataño
Send the drawings or the site, size and use. We design or detail the steel for Cataño’s hurricane, earthquake and salt-air conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to San Juan. WhatsApp, email or a video call with our engineers, booked at an hour that suits San Juan. Our contact page for Puerto Rico has the ports, the local time and the form.