Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Turks and Caicos · Coatings

Coatings for steel in the salt air of Turks and Caicos

The islands were once known for salt, raked from the salinas of Grand Turk and Salt Cay. Salt is still everywhere: on the trade winds across the low islands, in the spray on Grace Bay and in the ground around the old salt ponds. For Turks and Caicos we choose preparation, coating system and thickness for each exposure and record them member by member.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped to Providenciales.

Coated members drying in rows on stands in the paint hall
Members drying in the World Steel paint hall in Vietnam after coating.
Beachfront
Open sea exposure
Everywhere
Salt in the wind
Brands
Jotun, PPG, Hempel and more
Option
Hot-dip galvanizing

Exposure

Matching the system to the site

Typical choices for Turks and Caicos, confirmed with your engineer for each project.

SiteTypical protection
Enclosed, air-conditioned buildingZinc-rich primer and finish coat on sheltered steel
Inland ProvidencialesZinc-rich primer, epoxy intermediate, polyurethane finish
Grace Bay and beachfront resortsMarine-grade high-build system or duplex
Grand Turk, Salt Cay and South CaicosHot-dip galvanizing or duplex systems
Docks and marinasDuplex systems for splash and spray

In our plant

How coating quality is built in

Blast cleaning

Members for Turks and Caicos are blast cleaned to the specified grade before priming.

Trained painters

Our painters are trained and certified by the paint manufacturer for the systems they apply to steel bound for Turks and Caicos.

Measured film

Dry film thickness measured and recorded for every member shipped to Turks and Caicos.

Brands sold locally

Jotun, PPG, Hempel, International Paint and others are sold across the Caribbean, so crews in Turks and Caicos can buy them for touch-up.

Turks and Caicos

After erection

Every bundle shipped to Providenciales carries a touch-up note naming the paint system, so your crew repairs handling damage with the same product.

Products and solutions

The World Steel pages behind this guide

District by district

How this applies in your district

Turks and Caicos has 6 districts. Open South Caicos, Grand Turk or Salt Cay to see the local wind, ground and coast, the road from Providenciales and the steel we recommend there.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Turks and Caicos project is cut, welded, inspected and packed.

Roller conveyor carrying members into a shot-blasting machine
Surface preparation: the automatic shot blaster at the Vietnam plant.
Primed column with its bolted end plate set on painting stands
Primer on a column and its end plate at the Vietnam plant, ready for the next coat.
Galvanized poles and channels with wrapped flanges stacked in a yard
Galvanized tower members with their flanges wrapped for shipping, Vietnam.
Members in gray finish paint laid out in the paint hall
Gray finish coat applied in the Vietnam paint hall.

Q&A

What Turks and Caicos Islander buyers ask

Should resort steel be galvanized?

Exposed steel close to the beach often is, or gets a duplex system. Enclosed steel inside the building can take a lighter system.

Is any site in the islands sheltered from salt?

Few are. Even inland sites on Providenciales see salt in the wind, so we size systems for the real exposure.

Can we buy matching touch-up paint?

Yes. The brands we use are sold across the Caribbean, and each shipment to Providenciales names the products.

Contact World Steel · Turks and Caicos

Talk to us about steel for Turks and Caicos

WhatsApp, email or a video call with our engineers, booked at an hour that suits Cockburn Town. Our contact page for Turks and Caicos has the ports, the local time and the form.