The parts
What a guard is made of
- Top railAt about 1,070 mm (42 in), per the rule that applies
- Mid rail or infillCloses the gap below the top rail
- Toe boardStops tools and parts falling over the edge
- PostsBolted to the floor framing
Why it pays
No edge left open
No open edges
Mapped on the drawings.
Protects people below
Toe boards stop falling tools.
Rules applied
IBC or OSHA, whichever governs.
With the floor
Ships with the mezzanine.
How it is planned
Every edge on the drawings
- Edges mappedEvery open side.
- Guards drawnPosts, rails, gates.
- FabricatedSets marked by edge.
- Shipped togetherWith the floor steel.
Specification
Guardrails at a glance
- Parts
- Posts, top rail, mid rail or infill, toe board
- Design
- To the IBC or OSHA 1910 Subpart D, whichever applies
- Loads
- Such as 890 N (200 lb) on the top rail
- Gates
- Self-closing gates at ladder and loading openings, per design
- Finish
- Galvanized, painted or safety yellow
- Layout
- Every open edge mapped on the drawings
Photo
PhotoWhere it goes
Floors with open edges
Questions
Guardrail questions
How high is a guardrail?
Usually about 1,070 mm (42 in) at the top rail, but the exact rule depends on whether the IBC or OSHA 1910 Subpart D applies. Your designer confirms it and we design to it.
What about loading points on a mezzanine?
Self-closing safety gates or swing gates can close the opening where pallets are loaded, designed with the guard.
Do you supply the guards installed?
No. We design, fabricate and supply; your US contractor installs them with the mezzanine.
More mezzanines and floors: Steel Mezzanine Frames · Composite Floor Support Steel · Metal Decking · Steel Platforms · Equipment Floors · Access Walkways · Industrial Floor Support Structures · Stairs
Next step
Price it, or build with us for the long run
Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.
Request a quote for Guardrails
Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.
Become our partner in the US
Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.
Catalog record Verified
Sized by our engineers for your loads and code, then listed line by line in your quote.
Related solutions