Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Steel frame of the Barfoot Community Center in the United States, with a two-story gable end and stair

Community facilities

One hall, many uses, one steel frame

A community center is a lunch room at noon, a basketball court after school, a banquet hall on Saturday and, in some towns, a shelter when the storm comes. Our plant fabricates 2,500 t of structural steel a month, and we design halls like this for the US contractors who build them, from a single center to a county-wide program.

Pictured: Barfoot Community Center, United States, 2024, framed with World Steel structural steel.

Large-project capacity

From one town hall to a county-wide program

World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so the steel package of a large US job runs as one order.

2,500 metric tons a month

A day in the hall

The same room changes use four times, and the steel has to allow for all of them

Choose a time of day to see how the hall is used and what that asks of the frame. The red marks are the only columns: none stand in the hall itself.

KITCHEN OFFICES RESTROOMS STORAGE SERVING LINE STAGE PLAN · HALL CLEAR OF COLUMNS

From our project files

Community halls we have already framed

Barfoot Community Center (US, 2024) mixes a two-story hall with smaller rooms around it, and North West Community Center (US, 2023) is another civic building on our steel. The Goldfields Arts Centre in Western Australia is a cultural venue roofed with about 400 t of curved rafters. All were designed, fabricated and shipped by World Steel.

Barfoot Community Center steel frame with stair to the upper floor Photo
Barfoot Community Center building with sheathing installed over the steel frame Photo
Aerial view of the Goldfields Arts Centre curved steel roof in Western Australia Photo
Curved built-up steel rafters inside the Goldfields Arts Centre Photo

Scope, in writing

What we supply and what stays with your team

World Steel, our plant in Vietnam

  • Structural design of the hall, the rooms around it and any shelter area to the criteria your Engineer of Record sets
  • Long-span frames, trusses or curved built-up rafters from our own plant
  • Shop and erection drawings at no extra cost, with hang points for rigging, goals and lighting
  • Fabrication in our IAS AC472-accredited plant in Vietnam, tracked live in PEB Studio

The US contractor, our customer

  • Drawing approval, the PE seal and the permit with your Engineer of Record
  • Foundations, erection and special inspections on site
  • Stage, rigging and sports equipment supply and installation
  • Coordination with the owner, the architect and community stakeholders

Questions from US contractors

Community facility steel: questions and answers

7 answers, grouped by topic.

Designing a multi-use hall 3 answers

How wide can a community hall span without columns?

Steel frames and trusses routinely clear a full basketball court and seating. The span for your hall is set from the architect’s plan and checked for the roof loads, including anything hung from it.

Can the roof carry stage rigging and sports equipment?

Yes, when the loads are known before design. Send the rigging plan and equipment list, and the hang points are designed into the frame and shown on the shop drawings.

Can a community center be designed as a storm shelter?

Where your Engineer of Record sets ICC 500 or other shelter criteria, we design the steel framing to them and provide calculations for their review.

References 2 answers

Have you supplied community buildings in the United States?

Yes. Barfoot Community Center (2024) and North West Community Center (2023) are US civic buildings framed with World Steel structural steel.

Do you make curved roofs for cultural buildings?

Yes. The Goldfields Arts Centre in Western Australia used about 400 t of curved built-up rafters fabricated in our plant in Vietnam.

Scope and scale 2 answers

Who erects the building?

The US contractor, our customer. World Steel designs, fabricates and supplies the steel; erection, the PE seal and the permit stay with the contractor and their Engineer of Record.

Can you supply several community buildings for one county program?

Yes. The plant fabricates 2,500 t of structural steel a month, so several centers can run as one order with a shipping sequence per site.

Keep reading

Related pages

Price it or partner with us

Tell us everything the hall has to do.

Share the plans, the uses through the week and anything that hangs from the roof. We will size the frame for all of them and price the steel.

Why US contractors price with us

2,500 t / month

Own plant capacity, about 2,750 short tons

IAS AC472

Accredited since 2019, audited twice a year

Up to 5,000 t

Largest single job: Sunpro Steel, 2024

See our largest jobs →

Short project form

Tell us about the building

Ask an engineer directly, or drop the basics below. You get a written scope of supply for a US-code building, checked by engineering first.

Or call +84 902 881 833

Or leave your project details