Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Guyana · Coatings

Coatings and galvanizing for steel in Guyana’s humid climate

Guyana’s coast combines heat, humidity close to saturation, salt from the Atlantic and water that stands after rain. Steel that is not properly prepared and coated starts to rust within a season. For the Guyana footbridges we specified epoxy systems of 150 or 200 µm, with galvanizing as an option. Every project gets a system chosen for its exposure.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped to Georgetown, as for our 18 Guyana footbridges.

Coated members drying in rows on stands in the paint hall
Members drying in the World Steel paint hall in Vietnam after coating.
Climate
Hot, humid, salty coast
Footbridges
Epoxy 150 or 200 µm
Option
Hot-dip galvanizing
Brands
Jotun, PPG, Hempel and more

Exposure

Matching the system to the site

Typical choices for Guyana, confirmed with your engineer for each project.

SiteTypical protection
Inland, enclosed buildingPrimer and finish coat on sheltered steel
Georgetown and the coastZinc-rich primer, epoxy intermediate, finish coat
Riverside and shore basesHigh-build epoxy system or hot-dip galvanizing
Bridges and exposed walkwaysEpoxy 150 to 200 µm, or galvanizing
Mines and process plantsSystems chosen for the chemicals present

In our plant

How coating quality is built in

Blast cleaning

Members for Guyana are blast cleaned to the specified grade before priming.

Trained painters

Our painters are trained and certified by the paint manufacturer for the systems they apply to steel bound for Guyana.

Measured film

Dry film thickness is measured and recorded for every member.

Brands sold in the region

Jotun, PPG, Carboline, Hempel, Nippon and International Paint are sold in the Caribbean for touch-up.

Guyana

After erection

Every bundle ships with a touch-up note naming the paint system, so your crew repairs handling damage with the same product and the protection stays continuous.

Products and solutions

The World Steel pages behind this guide

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Guyanese project is cut, welded, inspected and packed.

Roller conveyor carrying members into a shot-blasting machine
Surface preparation: the automatic shot blaster at the Vietnam plant.
Primed column with its bolted end plate set on painting stands
Primer on a column and its end plate at the Vietnam plant, ready for the next coat.
Galvanized poles and channels with wrapped flanges stacked in a yard
Galvanized tower members with their flanges wrapped for shipping, Vietnam.
Members in gray finish paint laid out in the paint hall
Gray finish coat applied in the Vietnam paint hall.

Q&A

What Guyanese buyers ask

What coating did you use on the Guyana footbridges?

Epoxy systems of 150 or 200 µm, with hot-dip galvanizing offered as an option.

Is galvanizing better than paint in Guyana?

For exposed steel and parts near water, galvanizing is often the best choice. For large frames inside the envelope, a good epoxy system is usually enough.

Can we buy matching touch-up paint locally?

Yes. The brands we use are sold in the region and each shipment names the exact products.

Contact World Steel · Guyana

Talk to us about steel for Guyana

WhatsApp, email or a video call with our engineers, booked at an hour that suits Georgetown. Our contact page for Guyana has the ports, the local time and the form.