Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Guyana industrial estates · Belvedere

Steel buildings for the Belvedere Industrial Estate on the Corentyne, Berbice

Belvedere is Berbice’s own industrial estate: sixteen parcels on drained and filled land in the Corentyne, a business incubator, and a short road to the Suriname border. Parcels are compact and the land is low, so buildings must use every square metre and keep their floors above the water. We design them for the parcel, fabricate them in our IAS AC472 accredited plant in Vietnam at 2,500 t a month and ship them to Georgetown for the road east over the Berbice River Bridge.

Belvedere, from public reports

16 parcels
about 1,300 m² (14,000 sq ft) each
2008
land filled, drained and empoldered
2020
business incubator launched

2,500 t a month of structural steel from our own plant, FOB Vietnam or CIF Georgetown.

Estate profile

Belvedere at a glance, from public reports

What Guyanese government and press reports say about the estate.

2007

Where

Belvedere, Central Corentyne, East Berbice-Corentyne (Region 6).

2009

Parcels

Sixteen parcels of about 1,300 m² (14,000 sq ft) each.

2009

Land works

Land filling, drainage and empoldering finished in 2008, with a reinforced concrete bridge.

2009

Leases

Lease custody with the Kilcoy/Hampshire Neighbourhood Democratic Council; the Central Corentyne Chamber of Commerce partnered on the estate.

2021

Business incubator

A Belvedere business incubator was launched in February 2020, with power restored that November.

2013

Market

Close to the Suriname market across the Corentyne River.

Sources: Stabroek News (2007), Kaieteur News (2009, 2013), Department of Public Information (2021). Reports of the estate’s total size conflict; check parcels and leases with the estate’s managers.

Parcel buildings

What fits on one Belvedere parcel

A parcel of about 1,300 m² holds a building of 600 to 800 m² with room for a truck to turn, park and load. These are illustrative layouts; we set the real one to your lease plan and the setbacks your engineer and the council apply.

Compact factory

20 m × 36 m (66 × 118 ft)

720 m² floor, yard to the side

Store with office

18 m × 40 m (59 × 131 ft)

720 m² with a mezzanine office

Packhouse and dryer

16 m × 40 m (52 × 131 ft)

640 m² with an open drying canopy

Low land

Built for low, drained land

The Corentyne coast is flat and low, held dry by sea dams, canals and kokers. Belvedere’s land was filled and drained before plots were laid out, but heavy rain still finds the lowest floor. We set base plates and wall bases to the floor level your engineer fixes, size gutters for tropical downpours and keep the light steel frame easy on the soft clay below.

  • Floor level set above the design flood by your engineer
  • Gutters and downpipes sized for cloudbursts
  • Light frames that keep pile loads low
  • Wall bases and sheeting kept off wet ground

Small units

Small units for new Berbice businesses

An incubator turns first products into firms that need their own space. A row of small steel units under one roof, each with its own door, lets young businesses grow from one unit to two without moving away.

Delivery

Georgetown to the Corentyne

Our steel lands at Georgetown after about 45 days at sea from the Vietnamese port on a typical sailing, confirmed at booking. It travels east along the coast road and over the Berbice River Bridge to the Corentyne. Bundles are sized for road trucks and labelled by building and area, so a small crew can unload and erect in order. We supply FOB at the Vietnamese port or CIF Georgetown.

  1. Vietnamese port to GeorgetownAbout 45 days, typical sailing
  2. Coast road eastThrough Mahaica and Rosignol
  3. Berbice River BridgeInto New Amsterdam and the Corentyne
  4. Belvedere parcelUnloaded in erection order

From our plant

Portal frames, saw cuts and painted members

Real World Steel photos from our plant in Vietnam. None is shown as a Belvedere site.

Long factory building framed with red tapered portal frames and roof purlins
Two welders operating a submerged-arc welding station on a member
Coated frame parts with welded brackets in the paint hall
Gray members stacked and strapped together on a packing rack

Every parcel building is designed to the code basis your engineer names, made in an IAS AC472 accredited plant and checked to an inspection plan you agree.

Already shipped to Guyana

Steel we have designed, fabricated and shipped to Georgetown

Real World Steel jobs for Guyana, made in our own plant in Vietnam and erected by the local contractor, our customer.

18pedestrian bridges
6warehouses
2large maintenance workshops
1office building
1mosque in Georgetown

Questions

Questions on steel buildings at Belvedere

Where is the Belvedere Industrial Estate?

At Belvedere in Central Corentyne, Region 6 (East Berbice-Corentyne), according to public reports, close to the Suriname market across the Corentyne River.

How big is a Belvedere parcel?

Public reports describe sixteen parcels of about 1,300 m² (14,000 sq ft) each. Check current parcels and leases with the estate’s managers.

What size of building fits on one parcel?

Usually 600 to 800 m², such as a 20 m × 36 m (66 × 118 ft) factory, leaving room for a truck to turn and load. We set the layout to your lease plan and setbacks.

How do you handle the low, wet ground?

Your engineer sets the floor level and foundations; we design a light frame with base plates and wall bases set to that level and gutters sized for heavy rain.

Can you supply small units for incubator businesses?

Yes. A row of small units under one roof, each with its own door, can be designed so firms take one unit and grow into the next.

How does the steel get to the Corentyne?

By sea to Georgetown, about 45 days from the Vietnamese port on a typical sailing, confirmed at booking, then by road east and over the Berbice River Bridge. We supply FOB Vietnam or CIF Georgetown.

Building on a Belvedere parcel?

Send the parcel plan and what you will make or store. We fit the building to the parcel, design it to your engineer’s code basis and ship it to Georgetown in erection order.