Estate profile
What Guyanese government and press reports say about the estate, and what each point means for the steel on your plot.
| Topic | Public reports say | What it means for your steel | Year |
|---|---|---|---|
| Where | Plantation Eccles, East Bank Demerara, about 6 km (4 miles) south of Georgetown. | Short truck runs from the wharves; deliveries planned around the busy East Bank road. | 2007 |
| Size and plots | About 54 acres (21.9 ha), plots 1 to 84 of Block DD. | Most buildings fill one plot, so spans and setbacks are set by the lease line. | 2017 |
| Who manages it | Administered by NICIL until 2017, then handed to the ministry responsible for industry and commerce. | Lease use and building plans go to the estate’s manager before the local authority. | 2017 |
| Leases regularised | In 2021 the ministry moved to regularise leases and revive the estate management committee. | A clear lease plan and use are the first drawings we ask for. | 2021 |
| Safety on the estate | Inspections in 2021 stressed working fire hydrants, street lighting and occupational safety. | Fire separation, exits and rated walls are designed in from the first layout. | 2021 |
| Roads | Reports noted heavy vehicles and derelict machinery crowding estate roads. | We size bundles and trucks for narrow estate roads and short unloading windows. | 2021 |
Sources: Stabroek News (2007, 2017), Guyana Chronicle, iNews Guyana and HGPTV (2021). Check current lease terms with the estate’s manager.
Plot-sized buildings
Illustrative sizes for typical Eccles uses. We set every building to your own lease plan, setbacks and truck turning, then design the frame for the loads your engineer of record sets.
Sizes are examples, not Eccles plot dimensions. Crane capacity, floor loads and eave height are confirmed with your engineer.
Standards and approvals
World Steel designs and fabricates; your engineer of record approves and seals; your contractor erects. Codes are the ones your engineer names, and we design to them.
You hold the lease and its approved use from the estate’s manager. We start from the lease plan and the use.
Your engineer of record names the code basis, usually the Guyana National Building Code with IBC and AISC 360 references.
We design the frame, connections and base reactions and issue calculations and drawings, shop drawings included at no extra cost.
Your engineer reviews, approves and seals; your team files with the local authority.
We fabricate and ship; your contractor erects from our erection drawings and piece marks.
Behind the drawings: an IAS AC472 accredited plant, EN 10204 3.1 mill certificates, qualified welding procedures and the Guyana National Building Code guide.
Fire safety
On Eccles plots buildings stand close to each other and to the road. Where the code or your insurer asks for it, we design walls near the lease line for rated assemblies, keep exit doors and routes clear in the layout, and coordinate fire protection on the steel with your engineer.
Delivery
Steel lands at the Georgetown wharves after about 45 days at sea from the Vietnamese port on a typical sailing, confirmed at booking. Eccles is then a short truck run south along the East Bank. We supply the Caribbean on two terms only: FOB at the Vietnamese port or CIF Georgetown.
From our plant
Real World Steel photos from our plant in Vietnam and from buildings we supplied. None is shown as an Eccles site.
Guyana industrial estates
Each estate has its own plots, ground and tenants, so each has its own guide.
Already shipped to Guyana
Real World Steel jobs for Guyana, made in our own plant in Vietnam and erected by the local contractor, our customer.
Questions
Yes. Send the lease plan, the approved use and what the building must hold. We set the spans, bays and eave height to the plot and design the frame to the code basis your engineer of record names.
Public reports describe about 54 acres (21.9 ha) with plots 1 to 84 of Block DD, Plantation Eccles. Check current plot details with the estate’s manager.
The estate’s manager approves the lease use, your engineer of record approves and seals the structural design, and your team files with the local authority. We supply the calculations and drawings they ask for.
Yes. Crane runways and mezzanine frames are designed into the main frame. We supply overhead cranes with the building on request.
Where the code or your insurer requires it, walls near the lease line are designed for rated assemblies and exits are placed in the first layout. Fire protection on the steel is coordinated with your engineer.
It is shipped to Georgetown, about 45 days from the Vietnamese port on a typical sailing, confirmed at booking, then trucked a few miles south along the East Bank. We supply FOB Vietnam or CIF Georgetown.
Send the lease plan and the use. We design the steel to your engineer’s code basis, fabricate it in our plant and ship it to Georgetown in erection order.