Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Guyana industrial estates · Lethem

Steel buildings for the Lethem Industrial Estate on the Brazil border

Lethem faces Brazil across the Takutu River, and its industrial estate at Bon Success was laid out on 70 acres for businesses that trade with Roraima. New plans add a fuel and gas farm, a processing hub and a better road from Linden. Steel for Lethem travels further than anywhere else in Guyana, so it has to be packed and detailed for the road. We design and fabricate it in our IAS AC472 accredited plant in Vietnam at 2,500 t a month and ship it to Georgetown for the drive south.

Lethem, from public reports

70 acres
about 28 ha at Bon Success
70 businesses
planned, with 4 anchor tenants
Takutu
bridge to Bonfim, Brazil

2,500 t a month of structural steel from our own plant, FOB Vietnam or CIF Georgetown.

Estate profile

Lethem at a glance, from public reports

What Guyanese government and press reports say about the estate and the plans around it.

2019

Where

Bon Success, on the right bank of the Takutu River near Lethem, Region 9 (Upper Takutu-Upper Essequibo).

2016

Size

About 70 acres (28 ha), designed for about 70 businesses with 4 anchor tenants.

2019

Services planned

About 3,020 m of roads, 6,040 m of drains, a water network and retention ponds, built in phases.

2016

Market

Planned to serve Brazilian buyers in Bonfim, Boa Vista and the state of Roraima.

2025

New plans

A fuel and gas farm for northern Brazil, a commodities terminal on the Linden–Lethem road and a food and livestock processing hub.

2025

Road

A commitment to finish phase 2 of the Linden–Lethem road and improve the Lethem–Bonfim crossing.

Sources: Department of Public Information (2016, 2019, 2021), News Room (2025). Earlier completion targets were missed; check the estate’s current status with its managers.

Road south

From the Vietnamese port to the Brazil border

Steel for Lethem sails to Georgetown, then drives the length of Guyana. Each leg shapes how we pack it.

  1. Vietnam to GeorgetownAbout 45 days at sea, typical sailing, confirmed at booking
  2. Georgetown to LindenPaved highway south from the coast
  3. Through the forestThe Linden–Lethem road, partly unpaved, through the forest belt
  4. Across the savannahOpen Rupununi grassland to Lethem
  5. Bon SuccessThe estate gate, beside the Takutu bridge to Brazil

Packing

Packed for the long road south

A long haul on a partly unpaved road changes how a building is packed and joined. We plan the package for it from the first drawing.

Members split with bolted splices to fit the truck.

Member lengths for the truck

Pieces kept within the truck length your haulier confirms, often 12 m (39 ft), with bolted splices where a member is longer.

Bolted, not welded on site

Every site joint is bolted, so the crew needs no welding plant or power on a remote plot.

Bundles that ride rough roads

Strapped, dunnaged and wrapped bundles that stay tight over washboard and dust.

Count and check at the gate

Bundle lists by building and area, so pieces can be counted on arrival before the truck leaves.

Buildings

Steel for the Brazil trade at Lethem

The buildings a border estate needs, each linked to the World Steel package behind it.

Cold stores and processing

Cold rooms and processing halls for beef, fish and produce from the savannah.

Cold storage buildings

Fuel depot canopies

Canopies, pump shelters and stores for a fuel and gas depot.

Steel canopies

Savannah climate

Savannah sun, dust and a long wet season

The Rupununi has a hot, dusty dry season and a long rainy season when rivers rise and roads soften. Insulated roofs keep stores cool, ventilators move hot air out, and deliveries are planned for the dry months when the road is at its best.

  • Insulated roof panels against the savannah sun
  • Ridge vents and louvers for hot air
  • Shipments timed for the dry season
  • Gutters sized for the wet season

From our plant

Long spans, ground edges and bundles ready to ship

Real World Steel photos from our plant in Vietnam. None is shown as a Lethem site.

Tall columns and rafters inside a clear-span building with roof sheeting on
Fitter grinding a cut steel edge, sparks flying, on the shop floor
Fabricated members lined up along a railed walkway
Steel bundles stacked high on a packing frame awaiting loading

Every Lethem building is designed to the code basis your engineer names, made in an IAS AC472 accredited plant and checked to an inspection plan you agree.

Already shipped to Guyana

Steel we have designed, fabricated and shipped to Georgetown

Real World Steel jobs for Guyana, made in our own plant in Vietnam and erected by the local contractor, our customer.

18pedestrian bridges
6warehouses
2large maintenance workshops
1office building
1mosque in Georgetown

Questions

Questions on steel buildings at Lethem

Where is the Lethem Industrial Estate?

At Bon Success on the right bank of the Takutu River near Lethem, Region 9, beside the bridge to Bonfim in Brazil, according to public reports.

How big is the Lethem estate?

Public reports describe about 70 acres (28 ha), designed for about 70 businesses with 4 anchor tenants. Earlier completion targets were missed, so check its current status with the estate’s managers.

How does steel get from Georgetown to Lethem?

By sea to Georgetown, about 45 days from the Vietnamese port on a typical sailing, confirmed at booking, then by truck south through Linden on the Linden–Lethem road. We supply FOB Vietnam or CIF Georgetown.

Do I need welding on site at Lethem?

No. We detail every site joint as a bolted connection, so a crew can erect without welding plant or site power.

How long can the steel members be?

Within the truck length your haulier confirms for the Linden–Lethem road, often 12 m (39 ft). Longer members are split with bolted splices.

What buildings do you supply for the Brazil trade?

Trade warehouses, cold stores and processing halls, fuel depot canopies and pump shelters, workshops, equipment shelters and camp buildings.

Building at Lethem?

Send the plot, the use and the haulier’s truck limits. We design a bolted building packed for the road south, fabricate it in our plant and ship it to Georgetown.