Showrooms, trade counters, offices and small warehouses facing the zone roads.
Zone tiers
Three tiers of lots, three families of steel buildings
Each tier asks for a different building. Company counts are the plan reported by Stabroek News in 2023, not allocations.
Food and drink plants, packing houses, assembly and small fabrication shops.
Machining, steel fabrication and oil and gas support plants with crane bays and heavy floors.
Build-out
From canefield to industrial zone, as public reports tell it
Land cleared and tendered
Infrastructure tendered in six lots; clearing, roads and canals begin.
Roads and bridges
About 18.9 km of access roads, reinforced concrete composite bridges and three truck roads in phase 1.
Investment regime
A special investment regime for the Enmore Development Zone is announced for Parliament.
Tenants building
The zone is described as a hub for manufacturers and small businesses.
Sources: Stabroek News (2023), Department of Public Information (2024, 2026), Guyana Times (2024). Check lot availability with the zone’s managers.
Old sugar buildings
New life for old sugar buildings
Some tenants start inside the estate’s old sheds, as the machining project in the former sugar packaging plant shows. Steel suits that work: new frames inside an old shell, a new roof on old columns after a check by your engineer, mezzanines and crane runways added to a shed that still stands.
- Mezzanine floors inside an existing shed
- New crane runways on new columns
- Replacement roof and wall sheeting
- Steel sized to your engineer’s survey
Program supply
Many tenants, one fabricator
A new zone is a program: dozens of buildings of a few types, ordered over a few years. One fabricator with 2,500 t a month keeps details, colours and parts the same from the first lot to the last, so contractors erect faster and owners stock fewer spares.
Standards, shipping and quality for every lot
- Designed to the code your engineer names; see the Guyana building code guide.
- Fabricated in an IAS AC472 accredited plant, with EN 10204 3.1 mill certificates.
- Shipped FOB Vietnam or CIF Georgetown, about 45 days at sea on a typical sailing, confirmed at booking; Georgetown delivery guide, voyage simulator.
- Checked to an inspection plan you agree, with live access for your inspector.
From our plant
Beam lines and primed columns for a new zone
Real World Steel photos from our plant in Vietnam. None is shown as an Enmore site.
Guyana industrial estates
The other estates we build steel for
Each estate has its own plots, ground and tenants, so each has its own guide.
Already shipped to Guyana
Steel we have designed, fabricated and shipped to Georgetown
Real World Steel jobs for Guyana, made in our own plant in Vietnam and erected by the local contractor, our customer.
Questions
Questions on steel buildings in the Enmore and Foulis zone
What is the Enmore and Foulis development zone?
Public reports describe about 662 acres of former East Demerara sugar estate land at Enmore and Foulis on the East Coast Demerara being laid out with roads, bridges and lots for commercial, light-industrial and heavy-industrial tenants.
What buildings do you supply for the zone?
Showrooms and offices for the commercial lots, food, packing and assembly plants for light industry, and crane-bay plants and workshops for heavy industry, all designed to your engineer’s code basis.
Can you add steel inside an old sugar building?
Yes. After your engineer surveys the shell, we can design new frames, mezzanines, crane runways or a new roof inside or on the existing building.
Can one fabricator supply many tenants in the zone?
Yes. Our plant fabricates 2,500 t a month, so a program of many buildings can share one set of details, colours and parts.
Who erects the buildings?
Your contractor. World Steel supplies the steel structure only, with erection drawings, piece marks and engineers on call while your crew erects.
How does the steel reach Enmore?
By sea to Georgetown, about 45 days from the Vietnamese port on a typical sailing, confirmed at booking, then by road along the East Coast. We supply FOB Vietnam or CIF Georgetown.
Taking a lot at Enmore?
Send the lot, the tier and what you will make or store. We design the building to your engineer’s code basis, fabricate it in our plant and ship it to Georgetown in erection order.