Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Guyana industrial estates · Coldingen

Steel factory buildings for the Coldingen Industrial Estate, East Coast Demerara

Coldingen has made things on the East Coast since 1997: garments, furniture, castings and machined parts. Today tenants want bigger, brighter and drier sheds, and new access roads are tying the estate to the Railway Embankment. We design factory buildings for each trade, fabricate them in our IAS AC472 accredited plant in Vietnam at 2,500 t a month and ship them to Georgetown, about 21 km (13 miles) along the coast road.

Coldingen, from public reports

1997
year the estate opened
39 acres
about 15.8 ha in use
21 km
about 13 miles east of Georgetown

2,500 t a month of structural steel from our own plant in Vietnam, shipped FOB Vietnam or CIF Georgetown.

Estate timeline

Three decades of making things on the East Coast

Coldingen’s story from public Guyanese reports, and why each chapter shapes the sheds tenants order now.

  1. 1997

    The estate opens

    Coldingen opens on the East Coast with 38 plots for light manufacturing.

  2. 2010

    Tenants at work

    Garment, furniture and foundry shops run on about 39 acres (15.8 ha); several make their own power and ask for better drains.

  3. 2017

    Handed to government

    NICIL passes the estate to the ministry responsible for industry and commerce.

  4. 2021

    Plots reviewed

    The minister reviews plot use and lease terms and looks at requests for larger plots.

  5. 2026

    New access roads

    Roads linking the East Coast Public Road to the Railway Embankment at Coldingen are widened.

Sources: Stabroek News (2007, 2010, 2017), Department of Public Information (2021, 2026). Check current plots and leases with the estate’s manager.

Factories by trade

One estate, three trades, three different sheds

Sizes are typical starting points; we design every shed for the equipment and the plot your team gives us.

Garment and sewing halls

Long, bright floors for cutting and sewing lines, where heat and glare slow the work.

Span
24 to 36 m (79 to 118 ft) clear
Light
Skylight strips over the lines
Air
Ridge ventilators and louvers
Roof
Insulated panels against the sun

Furniture and joinery shops

Timber has to stay dry and finished pieces must leave without scraping a door frame.

Doors
Roller shutters up to 6 m (20 ft) wide
Store
Covered, ventilated timber bay
Dust
Frame ready to carry extraction ducts
Fire
Rated walls where the code asks

Foundry and engineering shops

Castings, machined parts and heavy repair work need a crane and a floor that takes it.

Crane
Runway for 5 to 20 t cranes
Heat
High eaves and roof vents over the pour
Floor
Base reactions sent to your engineer
Cranes
Supplied with the building on request

Rain and flood

Designed for East Coast downpours

The East Coast gets short, violent tropical rain on flat land near sea level. Water that overflows a gutter runs down the inside of the wall and onto the stock. We size the roof drainage from the rainfall intensity your engineer gives us and keep the water outside.

Rainfall intensity

Your engineer sets the design rainfall for the site and return period.

Roof slope and area

We set the slope and the area each gutter drains.

Gutters and downpipes

Box or eave gutters and downpipes sized with overflow outlets.

Floor and base level

Base plates and wall bases set to the floor level your engineer fixes.

Expansion

Bigger plot? Add bays, not a new building

Tenants have asked for larger plots. When yours grows, a shed designed for it from the start takes extra bays on the same frame line. We detail the end frame and bracing for the extension and keep the drawings, so the next bays come from the same plant to the same details.

Manufacturing plants and crane bays

Bays built nowBays added when the plot grows

Solar-ready roofs

A roof that pays back: solar-ready factories

Coldingen tenants have long run their own generators. A factory roof designed for solar panels from day one carries them without a later structural check, and a steel genset shelter keeps the generator dry beside it.

  • Panel loads allowed in the roof design
  • Cable support steel from roof to switchroom
  • Steel genset and switchgear shelter
  • Panel fixings checked for wind uplift

From our plant

Workshop frames and crane columns from our plant

Real World Steel photos from our plant in Vietnam and from buildings we supplied. None is shown as a Coldingen site.

Shop crew in safety gear among rows of painted steel members
Tall lattice columns of a crane-served industrial building during erection
Built-up members with welded stiffeners and drilled clip plates on shop supports
Steel bundles stacked high on a packing frame awaiting loading

Every Coldingen shed is checked to an inspection plan you agree, fabricated in an IAS AC472 accredited plant and designed to the code basis your engineer names.

Already shipped to Guyana

Steel we have designed, fabricated and shipped to Georgetown

Real World Steel jobs for Guyana, made in our own plant in Vietnam and erected by the local contractor, our customer.

18pedestrian bridges
6warehouses
2large maintenance workshops
1office building
1mosque in Georgetown

Questions

Questions on steel factories at Coldingen

What kind of factories do you build for Coldingen?

Garment and sewing halls, furniture and joinery shops, foundries and engineering shops, stores and bonds. Each is designed for its trade: daylight and airflow for sewing, dry storage and big doors for joinery, crane bays for engineering.

When did the Coldingen Industrial Estate open?

Public reports date the opening to 1997, with 38 plots. In 2010 about 39 acres (15.8 ha) were in use. Check current plots and leases with the estate’s manager.

Can the building take a crane?

Yes. Crane columns, runway beams and brackets are designed into the frame for cranes of the capacity you need, and we supply overhead cranes with the building on request.

How do you deal with heavy rain on the East Coast?

We size gutters, downpipes and overflows from the design rainfall your engineer sets and set the base levels to the floor level your engineer fixes, so water stays outside the walls.

Can my factory grow later?

Yes. We design the end frame and bracing so extra bays bolt on along the same frame line, and we keep the drawings for the next order.

On what terms do you supply Coldingen projects?

FOB at the Vietnamese port or CIF Georgetown, the two terms we offer in the Caribbean. The sailing to Georgetown takes about 45 days on a typical schedule, confirmed at booking.

Planning a factory at Coldingen?

Tell us the trade, the plot and the equipment. We design the shed for the work inside, fabricate it in our plant and ship it to Georgetown in erection order.