Project types
What we fabricate for Dominica
Terminals and hangars
Long-span frames for terminals, hangars and cargo sheds.
Housing
Repeatable steel frames for homes and apartment blocks.
Schools and shelters
Classrooms and halls designed to the shelter risk category.
Clinics and hospitals
Composite frames for health buildings.
Eco-resorts
Lodges, villas and restaurant roofs.
Energy buildings
Power house, workshop and pipe support steel.
Speed
Built fast, built to last the next storm
We fabricate while your site builds the foundations, then ship in erection order so frames rise area by area. Composite deck replaces most formwork, and the building closes in fast before the next hurricane season.
Large packages are released by building or by area. Our references include Sunpro Steel at 5,000 t, CPV Food at 2,500 t and the Long Son petrochemical complex at 2,000 t.
Who does what
Project work, split clearly
World Steel supplies
- Steel design or detailing to the Dominica building code
- Fabrication, coating and QC release
- Composite deck, studs and secondary steel
- Packing by building and shipping to Roseau
- Shop and erection drawings, included
The contractor arranges
- Owner contract and approvals
- Engineer of record approval
- Foundations and anchor bolts
- Erection and concrete topping
- Finishes, services and fit-out
Products and solutions
The World Steel pages behind this guide
Parish by parish
How this applies in your parish
Dominica has 10 parishes. Open St Peter, St John or St Andrew to see the local wind, ground and coast, the road from Roseau and the steel we recommend there.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Dominica project is cut, welded, inspected and packed.
Q&A
What Dominican buyers ask
Can you supply airport terminal and hangar steel?
Yes. Long-span terminal roofs, hangars and cargo sheds, designed for the wind your engineer sets and packed by area.
Can you supply repeatable housing frames?
Yes. Repeat house and apartment types are efficient to detail and fabricate in steel, and ship as kits.
Do you work with local contractors?
Yes. Contractors in Dominica are our customers: they win the work and erect it, and we design, fabricate and supply the steel.
Dominica solutions
Every Dominica guide
Related pages
Code facts on this page summarize practice in Dominica and the standards it references. They are not legal or engineering advice; your engineer of record and the Physical Planning and Development Authority confirm the code and edition in force for your project.
Contact World Steel · Dominica
Talk to us about steel for Dominica
WhatsApp, email or a video call with our engineers, booked at an hour that suits Roseau. Our contact page for Dominica has the ports, the local time and the form.