Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

St Patrick · Parish

Steel buildings and structural steel for St Patrick, Dominica

St Patrick is the south-east of Dominica, from Grand Bay on the south coast to La Plaine and Delices on the Atlantic side. Petite Savanne was abandoned after Erika’s landslides in 2015 and its people resettled.

The Atlantic side · Main town Grand Bay

Main town
Grand Bay
Group
The Atlantic side
Main towns
Grand Bay, La Plaine, Delices
Port
Woodbridge Bay, Roseau

Site conditions in St Patrick

What the site asks of your steel

Slopes
Landslide-prone ground
Wind
Atlantic exposure
Rain
Heavy rainfall
Seismic
Lesser Antilles arc

Our design note. After Erika, St Patrick needs housing, schools and halls on safer ground. Light steel frames on foundations designed for the slope, and full wind design, fit the parish.

St Patrick at a glance

The ground, the work and the road in

Ground and climate

Steep coastal slopes and gorges with landslide-prone ground.

What gets built

Agriculture, bay rum and farming, housing, schools and community services.

Getting steel there

About forty-five minutes from Woodbridge Bay Port through Roseau and the south.

Towns: Grand Bay · La Plaine · Delices · Petite Savanne · Boetica

Steel we recommend

What we fabricate for St Patrick

The three building types we are asked for most here, made in our own plant in Vietnam and shipped in erection order.

Schools, halls and shelters

Classrooms, community halls and sports buildings that double as hurricane shelters.

Sports facilities and arenas →

Multi-storey buildings

Steel frames with composite deck for offices, clinics, apartments and government buildings.

Multi-storey steel framing →

Farm and agro-processing

Packhouses, farm stores, drying sheds and agro-processing buildings.

Agricultural steel buildings →

Contractors in St Patrick

You win the job in St Patrick. We fabricate the steel.

Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.

Q&A

Questions about steel in St Patrick

Can you supply resettlement housing frames?

Yes. Repeatable steel housing frames, packed as kits per house or block.

Do landslide areas change the design?

Siting and foundations come first, set by your engineer. A light steel frame loads the slope less.

The Atlantic side

Other parishes: the atlantic side

St Andrew, St David and St Patrick: the airport at Melville Hall, the Kalinago Territory and the wild east coast.

Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the code basis in force in Dominica. World Steel designs and fabricates the steel; the contractor erects it.

Contact World Steel · Dominica

Talk to us about steel for St Patrick

Send the drawings or the site, size and use. We design or detail the steel for St Patrick’s hurricane, seismic and heavy-rain conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to Woodbridge Bay, Roseau. WhatsApp, email or a video call with our engineers, booked at an hour that suits Roseau. Our contact page for Dominica has the ports, the local time and the form.