Site conditions in St Andrew
What the site asks of your steel
- Wind
- Atlantic exposure
- Air
- Salt spray
- Rain
- Wet trade-wind coast
- Seismic
- Lesser Antilles arc
Our design note. St Andrew is where Dominica’s new international airport is being built. Terminal and hangar frames, housing, schools and eco-resorts face the Atlantic, so wind design and protected steel come first.
St Andrew at a glance
The ground, the work and the road in
Ground and climate
Volcanic hills and coastal terraces, with the broadest flat land on the island near the airport.
What gets built
Aviation, agriculture, tourism, housing, schools and services.
Getting steel there
About one hour from Woodbridge Bay Port over the trans-insular road, or from Portsmouth.
Towns: Marigot · Wesley · Calibishie · Woodford Hill · Melville Hall
Steel we recommend
What we fabricate for St Andrew
The three building types we are asked for most here, made in our own plant in Vietnam and shipped in erection order.
Hangars and terminals
Long-span frames for hangars, cargo sheds and terminal buildings.
Aircraft hangar buildings →Schools, halls and shelters
Classrooms, community halls and sports buildings that double as hurricane shelters.
Sports facilities and arenas →Eco-resorts and hotels
Hotel blocks, villas, lodges and restaurant roofs for nature tourism.
Multi-story steel buildings →Contractors in St Andrew
You win the job in St Andrew. We fabricate the steel.
Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.
Q&A
Questions about steel in St Andrew
Can you supply steel for the airport?
Yes. Terminal roofs, hangars and cargo sheds, designed for the wind your engineer sets and packed by area.
Can you supply eco-resorts at Calibishie?
Yes. Villas, restaurant roofs and lodges with marine coatings.
The Atlantic side
Other parishes: the atlantic side
St Andrew, St David and St Patrick: the airport at Melville Hall, the Kalinago Territory and the wild east coast.
Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the code basis in force in Dominica. World Steel designs and fabricates the steel; the contractor erects it.
Contact World Steel · Dominica
Talk to us about steel for St Andrew
Send the drawings or the site, size and use. We design or detail the steel for St Andrew’s hurricane, seismic and heavy-rain conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to Woodbridge Bay, Roseau. WhatsApp, email or a video call with our engineers, booked at an hour that suits Roseau. Our contact page for Dominica has the ports, the local time and the form.