Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

St Paul · Parish

Steel buildings and structural steel for St Paul, Dominica

St Paul runs from the Canefield coast, with its industrial estate and the small Canefield airport, up through Massacre and Mahaut to Pont Cassé, the crossroads in the heart of the island’s mountains.

Roseau and the south-west · Main town Pont Cassé

Main town
Pont Cassé
Group
Roseau and the south-west
Main towns
Canefield, Massacre, Mahaut
Port
Woodbridge Bay, Roseau

Site conditions in St Paul

What the site asks of your steel

Wind
Coast and mountain gusts
Rain
Wet interior
Slopes
Steep central mountains
Seismic
Lesser Antilles arc

Our design note. St Paul is Dominica’s industrial edge: factories, warehouses and airport buildings at Canefield, housing on the slopes above. Portal frames and long spans close to the port fit the parish.

St Paul at a glance

The ground, the work and the road in

Ground and climate

Coastal flats at Canefield climbing to steep central mountains and rainforest.

What gets built

Light industry, manufacturing, warehouses, the airport, housing and schools.

Getting steel there

About ten minutes from Woodbridge Bay Port along the west coast road.

Towns: Canefield · Massacre · Mahaut · Pont Cassé · Cochrane

Steel we recommend

What we fabricate for St Paul

The three building types we are asked for most here, made in our own plant in Vietnam and shipped in erection order.

Light industry and workshops

Portal frames for workshops, bottling, water and processing plants.

Manufacturing plants and crane bays →

Warehouses and logistics

Clear-span warehouses and distribution buildings for imports, food and building supplies.

Warehouse and distribution buildings →

Hangars and terminals

Long-span frames for hangars, cargo sheds and terminal buildings.

Aircraft hangar buildings →

Contractors in St Paul

You win the job in St Paul. We fabricate the steel.

Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.

Q&A

Questions about steel in St Paul

Can you supply factory buildings at Canefield?

Yes. Portal frames and crane bays for manufacturing and bottling plants.

Can you supply hangars at Canefield airport?

Yes. Hangar and cargo frames with door openings designed into the wind case.

Roseau and the south-west

Other parishes: roseau and the south-west

St George with Roseau and the port, St Paul, St Luke and St Mark down to Soufrière and Scotts Head.

Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the code basis in force in Dominica. World Steel designs and fabricates the steel; the contractor erects it.

Contact World Steel · Dominica

Talk to us about steel for St Paul

Send the drawings or the site, size and use. We design or detail the steel for St Paul’s hurricane, seismic and heavy-rain conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to Woodbridge Bay, Roseau. WhatsApp, email or a video call with our engineers, booked at an hour that suits Roseau. Our contact page for Dominica has the ports, the local time and the form.