Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Belize · Coatings

Coatings for steel on Belize’s cayes, coast and rainforest

Resorts on the cayes stand metres from the sea, Belize City breathes salt air, and the south gets more than 4,000 mm of rain a year in places. Heat and humidity never let up. We choose preparation, coating system and thickness for each exposure and record them member by member, so a caye cabana and an inland school each get the protection they need.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped to Belize City or Big Creek.

Coated members drying in rows on stands in the paint hall
Members drying in the World Steel paint hall in Vietnam after coating.
Cayes
Direct salt spray
South
Very high rainfall
Brands
Jotun, PPG, Hempel and more
Option
Hot-dip galvanizing

Exposure

Matching the system to the site

Typical choices for Belize, confirmed with your engineer for each project.

SiteTypical protection
Inland, enclosed buildingZinc-rich primer and finish coat on sheltered steel
Town near the coastZinc-rich primer, epoxy intermediate, polyurethane finish
Cayes and beachfrontMarine-grade high-build system or duplex
Rainforest and river sitesHigh-build epoxy with sealed details that shed water
Docks and exposed steelHot-dip galvanizing or duplex systems

In our plant

How coating quality is built in

Blast cleaning

Members for Belize are blast cleaned to the specified grade before priming.

Trained painters

Our painters are trained and certified by the paint manufacturer for the systems they apply to steel bound for Belize.

Measured film

Dry film thickness measured and recorded for every member shipped to Belize.

Brands sold in the region

Jotun, PPG, Hempel, International Paint and others are sold across the Caribbean, so crews in Belize can buy them for touch-up.

Belize

After erection

Every bundle shipped to Belize City carries a touch-up note naming the paint system, so your crew repairs handling damage with the same product.

Products and solutions

The World Steel pages behind this guide

District by district

How this applies in your district

Belize has 6 districts. Open Corozal, Stann Creek or Toledo to see the local wind, ground and coast, the road from Belize City and the steel we recommend there.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Belize project is cut, welded, inspected and packed.

Roller conveyor carrying members into a shot-blasting machine
Surface preparation: the automatic shot blaster at the Vietnam plant.
Primed column with its bolted end plate set on painting stands
Primer on a column and its end plate at the Vietnam plant, ready for the next coat.
Galvanized steel frames with punched bolt plates at the corners on shop trestles
Galvanized frames with their bolt holes open and clean after dipping, Vietnam.
Members in gray finish paint laid out in the paint hall
Gray finish coat applied in the Vietnam paint hall.

Q&A

What Belizean buyers ask

Should resort steel on the cayes be galvanized?

Exposed steel near the sea often is, or gets a duplex system. Enclosed frames usually take a high-build marine paint system.

Does inland steel need coatings for humidity?

Yes, though less than on the coast. Constant humidity and rain call for a sound primer and finish, with details that shed water.

Can we buy matching touch-up paint?

Yes. The brands we use are sold across the Caribbean, and each shipment to Belize City names the products.

Contact World Steel · Belize

Talk to us about steel for Belize

WhatsApp, email or a video call with our engineers, booked at an hour that suits Belmopan. Our contact page for Belize has the ports, the local time and the form.