Where
La Brea, south-west Trinidad, near a natural deepwater harbour.
Thirty years of LABIDCO
Milestones from the company’s own 30th-anniversary account.
Incorporated on 15 February 1995 as a subsidiary of NGC.
A yard with a 150 m dock, the only platform fabrication yard in the country.
Reconstructed for the load-out of the Juniper platform.
The Port of Brighton certified as an EcoPort, the first in CARICOM.
Source: NGC, “LABIDCO turns 30” (March 2025).
Estate profile
What NGC, InvesTT and industry reports say about the estate.
La Brea, south-west Trinidad, near a natural deepwater harbour.
About 407 acres (165 ha) of developed land.
About 36 tenants and 27 vacant lots.
Has delivered more than 10 offshore platforms.
A zone set aside for recycling and renewable energy businesses.
Bauxite from Guyana transshipped through the port.
Sources: NGC (2025), The Energy Year (2023), InvesTT Investment Guide (2022). Lot counts differ between sources; check with LABIDCO.
Port of Brighton
The Port of Brighton is jointly owned by National Energy and LABIDCO and handles platform load-outs, methanol and bulk cargo. Our CIF terms land the steel at Port of Spain; your broker clears it for the drive south to La Brea, or we pack it for a direct call when a project needs one.
Buildings
The buildings La Brea tenants order, each linked to the World Steel package behind it.
Workshops with crane bays for valves, pumps and subsea tools.
Crane runway beamsClear-span stores beside the berths for project cargo.
Warehouse buildingsOpen-sided sheds over laydown areas and fabrication bays.
Equipment sheltersRecycling and renewable energy buildings for the green zone.
Industrial buildingsSea air
Lots near the berths take salt spray every day. We pick coatings for the exposure your engineer sets and detail the frame so water drains away.
From our plant
Real World Steel photos from our plant in Vietnam. None is shown as a La Brea site.
Every building is designed to the code basis your engineer of record names, made in an IAS AC472 accredited plant and checked to an inspection plan you agree.
Trinidad and Tobago industrial estates
Each estate has its own lots, ground and tenants, so each has its own guide.
Large-project capacity
Our own plant in Vietnam fabricates 2,500 t of structural steel a month. These are real World Steel jobs, plus the steel we have already shipped to the Caribbean, erected by the local contractor, our customer.
Questions
At La Brea in south-west Trinidad, beside the Port of Brighton and near the Pitch Lake, according to public reports.
Public reports describe about 407 acres (165 ha) with about 36 tenants and 27 vacant lots in 2023. Check current lots with LABIDCO.
Service workshops with crane bays, port warehouses, laydown sheds and buildings for recycling and renewable energy firms in the green zone.
With a coating system chosen for the marine exposure your engineer sets, such as zinc-rich primer and epoxy coats, and galvanized members on request.
Yes. We design crane runways with the frame and can supply overhead cranes with the building on request.
By sea to Port of Spain, about 45 days from the Vietnamese port on a typical sailing, confirmed at booking, then by road south. We supply FOB Vietnam or CIF Port of Spain.
Send the lot, the use and your engineer’s code basis. We design, fabricate and ship CIF Port of Spain.