Where
Point Lisas, Couva, on the Gulf of Paria coast of central Trinidad.
Estate profile
What government, estate and industry reports say about the estate.
Point Lisas, Couva, on the Gulf of Paria coast of central Trinidad.
An 860-hectare estate, developed by National Energy in 1978.
Point Lisas Industrial Port Development Corporation (PLIPDECO), 51% owned by the government.
Ammonia, urea, methanol, melamine, steel, power and desalination plants.
The Port of Point Lisas, with six multi-user petrochemical and steel terminals nearby.
About 140,000 sq ft of new warehousing built in two phases at the port.
Sources: InvesTT Investment Guide (2022), The Energy Year (2018). Check lots and leases with PLIPDECO.
Plant buildings
Process plants buy more than one building. These are the packages we design and fabricate for energy estates.
Crane bays
Tall workshops with crane runways for turnaround work on pumps, compressors and valves.
Manufacturing plants and crane baysTo the plant spec
Pipe racks, cable bridges and access platforms detailed to the plant contractor’s specification.
Heavy industrial plantsClear span
Clear-span stores for catalyst, spares and bagged product, with wide doors for forklifts.
Warehouse buildingsOpen sided
Open or clad shelters over compressors and skids, with lifting beams where the plant needs them.
Equipment sheltersPort of Point Lisas
Our CIF terms land the steel at Port of Spain, where your broker clears it for the short drive south to Couva. Where a project ships to Point Lisas directly, we pack to suit the berth and the trucks that serve it.
Plant air
Steel near ammonia and urea plants and the sea needs a coating system chosen for both. We specify zinc-rich primers and epoxy or polyurethane systems from brands sold worldwide, so touch-up paint is easy to find in Trinidad.
Earthquake design
Trinidad sits near an active plate boundary. Your engineer sets the seismic design basis; we design the frame, braces and connections to it and fabricate them with qualified welders.
From our plant
Real World Steel photos from our plant in Vietnam. None is shown as a Point Lisas site.
Every building is designed to the code basis your engineer of record names, made in an IAS AC472 accredited plant and checked to an inspection plan you agree.
Trinidad and Tobago industrial estates
Each estate has its own lots, ground and tenants, so each has its own guide.
Large-project capacity
Our own plant in Vietnam fabricates 2,500 t of structural steel a month. These are real World Steel jobs, plus the steel we have already shipped to the Caribbean, erected by the local contractor, our customer.
Questions
At Point Lisas, Couva, on the Gulf of Paria coast of central Trinidad, beside the Port of Point Lisas, according to public reports.
Public reports describe an 860-hectare estate developed in 1978 and managed by PLIPDECO. Check lots and leases with PLIPDECO.
Maintenance workshops with crane bays, pipe racks and access platforms, catalyst and spares stores, compressor shelters and office frames.
A system chosen for salt and plant fumes, typically zinc-rich primer with epoxy and polyurethane coats, or hot-dip galvanizing for racks and platforms.
Yes. Your engineer of record sets the seismic basis; we design the frame and connections to it and issue the calculations for review.
By sea to Port of Spain, about 45 days from the Vietnamese port on a typical sailing, confirmed at booking, then by road to Couva. We supply FOB Vietnam or CIF Port of Spain.
Send the plant layout, the buildings you need and your engineer’s code basis. We design, fabricate and ship CIF Port of Spain.