ICT
Technology cluster
Shell buildings and offices with roofs for cooling plant.
Data center shellsClusters
The park was planned around four clusters, public reports say. Each needs a different steel building.
Technology cluster
Shell buildings and offices with roofs for cooling plant.
Data center shellsClean halls
Insulated, column-free halls for precision work.
Long-span structuresFood plants
Packhouses, dryers and cold rooms for processors.
Agricultural buildingsOffices and services
Multi-storey steel frames for offices and campus services.
Multi-storey framingPark profile
What InvesTT and press reports say about the park.
Wallerfield, about 45 km from Port of Spain and 10 minutes from Piarco airport.
About 1,100 acres, with 30% kept as permanent green space.
Inaugurated in November 2005.
Land lots of up to 83,785 m², and floor space in the flagship office complex.
eTecK, with InvesTT handling investor promotion.
Built on the former Waller Field air base.
Sources: Caribbean Beat (2009), InvesTT Investment Guide (2022). Occupancy has been debated in the press; check lots with eTecK.
Large lots
Tamana lots are large. These illustrative layouts show what a 2-ha lot can hold; we set the real one to your lease plan.
60 m × 120 m (197 × 394 ft)
7,200 m² hall with offices and a yard
48 m × 96 m (157 × 315 ft)
4,600 m² packhouse and cold rooms
36 m × 72 m (118 × 236 ft)
two-storey building with a data hall
Inland climate
Inland Trinidad is wetter and less salty than the coast. We size gutters for downpours, insulate roofs for the sun and keep buildings compact to leave the green space the park plans.
From our plant
Real World Steel photos from our plant and projects in Vietnam. None is shown as a Tamana site.
Every building is designed to the code basis your engineer of record names, made in an IAS AC472 accredited plant and checked to an inspection plan you agree.
Trinidad and Tobago industrial estates
Each estate has its own lots, ground and tenants, so each has its own guide.
Large-project capacity
Our own plant in Vietnam fabricates 2,500 t of structural steel a month. These are real World Steel jobs, plus the steel we have already shipped to the Caribbean, erected by the local contractor, our customer.
Questions
At Wallerfield in north-east Trinidad, about 45 km from Port of Spain and 10 minutes from Piarco International Airport, according to public reports.
Public reports describe about 1,100 acres, with lots of up to 83,785 m² and 30% kept as green space. Check current lots with eTecK.
ICT shells and offices, clean manufacturing halls, agro-processing packhouses and cold rooms, and multi-storey office frames.
Yes. We design the first building and the next to the same details so the campus grows without changes.
To the code basis your engineer of record names; the basis is printed on sheet one of the calculations and your engineer approves and seals.
By sea to Port of Spain, about 45 days from the Vietnamese port on a typical sailing, confirmed at booking, then by road east. We supply FOB Vietnam or CIF Port of Spain.
Send the lot, the cluster and your engineer’s code basis. We design, fabricate and ship CIF Port of Spain.