Light factory
40 m × 60 m (131 × 197 ft)
2,400 m² floor with a yard for trucks
Lot buildings
Lots run from about 0.5 to 2.1 acres, with a 10-acre lot for an anchor tenant. These are illustrative layouts; we set the real one to your lease plan and the setbacks your engineer applies.
40 m × 60 m (131 × 197 ft)
2,400 m² floor with a yard for trucks
36 m × 72 m (118 × 236 ft)
2,590 m² with dock doors on one side
24 m × 48 m (79 × 157 ft)
1,150 m² on two floors with a mezzanine
Estate profile
What the Ministry of Trade and Industry and InvesTT say about the estate.
Point Lisas, central Trinidad, about 10 minutes from the Port of Point Lisas.
A 144-acre estate with lots of 0.5 to 2.1 acres and one 10-acre lot.
78 leasable lots: light industry, two commercial lots and an anchor tenant on ten acres.
Described as the first 5G networked industrial estate in Latin America and the Caribbean.
Five factory shells, including a 4-bay shell of about 5,312 m² (57,178 sq ft).
eTecK, with InvesTT handling investor promotion.
Sources: Ministry of Trade and Industry (March 2022), InvesTT Investment Guide (2022). Check lots and leases with eTecK.
Tenant types
The estate targets light and advanced manufacturing, logistics and distribution, and ICT.
Clean halls
Insulated halls with clean floors, wide spans and roof steel for air handling.
Long-span structuresDock-high
Clear-span stores with dock doors, canopies and racking loads designed in.
Steel canopiesHeavy roofs
Shell buildings with roofs sized for cooling plant and raised floors.
Data center shellsFrom shell to own building
Many tenants start in a factory shell and move onto a lot as orders grow. We design the second building to match the first.
Start production in one of the estate’s factory shells.
Take a lot sized for the next stage of the business.
We size spans, bays and doors to the lot and the trucks that use it.
Fabricated in our plant and shipped CIF Port of Spain in erection order.
From our plant
Real World Steel photos from our plant in Vietnam. None is shown as a Phoenix Park site.
Every building is designed to the code basis your engineer of record names, made in an IAS AC472 accredited plant and checked to an inspection plan you agree.
Trinidad and Tobago industrial estates
Each estate has its own lots, ground and tenants, so each has its own guide.
Large-project capacity
Our own plant in Vietnam fabricates 2,500 t of structural steel a month. These are real World Steel jobs, plus the steel we have already shipped to the Caribbean, erected by the local contractor, our customer.
Questions
In Point Lisas, central Trinidad, about 10 minutes from the Port of Point Lisas and 5 minutes from the Point Lisas Industrial Estate, according to public reports.
Public reports describe lots of about 0.5 to 2.1 acres and one 10-acre lot, 78 lots in all on a 144-acre estate. Check current lots with eTecK.
Usually 2,000 to 2,600 m², such as a 40 m × 60 m (131 × 197 ft) factory, leaving a yard for trucks. We set the layout to your lease plan and setbacks.
Yes. Send the shell drawings and we design the new building with matching bays, doors and details.
Yes. Shell buildings with roofs designed for cooling plant, cable trays and phased halls.
By sea to Port of Spain, about 45 days from the Vietnamese port on a typical sailing, confirmed at booking, then by road to Point Lisas. We supply FOB Vietnam or CIF Port of Spain.
Send the lot plan and what you will make or store. We fit the building to the lot and ship it CIF Port of Spain.