Where
Cove, south-west Tobago.
Park profile
What the 2022 InvesTT guide says about the park.
Cove, south-west Tobago.
About 28.3 ha (70 acres).
Two multi-producer units and two factory shells.
E-IDCOT Ltd, the Tobago economic development company.
Source: InvesTT Investment Guide (2022). Check lots and units with E-IDCOT.
Island buildings
Island firms start small. These are the steel buildings that fit a Cove lot and grow with the business.
Units under one roof
A row of small units with their own doors, so firms can take the next unit as they grow.
Self-storage and unit buildingsClean halls
Washable halls for food, drink and cosmetics made on the island.
Manufacturing plantsDistribution
Stores for goods brought over from Trinidad for hotels and shops.
Warehouse buildingsIsland delivery
Steel for Cove lands at Port of Spain and crosses to Scarborough, so we keep bundles to sizes the inter-island crossing handles.
Eco design
Steel buildings are light, quick to erect and fully recyclable. We design roofs ready for solar panels and rainwater collection and keep coatings suited to the island’s salt air.
From our plant
Real World Steel photos from our plant in Vietnam. None is shown as a Tobago site.
Every building is designed to the code basis your engineer of record names, made in an IAS AC472 accredited plant and checked to an inspection plan you agree.
Trinidad and Tobago industrial estates
Each estate has its own lots, ground and tenants, so each has its own guide.
Large-project capacity
Our own plant in Vietnam fabricates 2,500 t of structural steel a month. These are real World Steel jobs, plus the steel we have already shipped to the Caribbean, erected by the local contractor, our customer.
Questions
At Cove in south-west Tobago, managed by E-IDCOT Ltd, according to public reports.
Public reports describe about 28.3 ha (70 acres), with two multi-producer units and two factory shells. Check units with E-IDCOT.
Rows of small units under one roof, food and drink plants and island distribution stores.
By sea to Port of Spain, about 45 days from the Vietnamese port on a typical sailing, confirmed at booking, then across to Scarborough. We supply FOB Vietnam or CIF Port of Spain.
Yes. We design the roof steel for the panel load your engineer sets.
No. World Steel designs and fabricates the steel; the local contractor, our customer, erects it.
Send the lot and what you will make or store. We design a light building for the island and ship it CIF Port of Spain.