Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Trinidad and Tobago industrial estates · Galeota

Steel buildings for the Port of Galeota supply base

At Guayaguayare on Trinidad’s south-east tip, the Port of Galeota is the main logistics hub for the east coast offshore fields: five berths, warehouses and serviced lots for supply and service companies. Supply bases need stores, workshops and shelters that stand up to Atlantic wind and salt. We design them to your engineer’s code basis, fabricate them in our IAS AC472 accredited plant in Vietnam at 2,500 t a month and ship them CIF Port of Spain.

Galeota, from public reports

5 berths
and a 200 m turning basin
18 lots
serviced, public reports
ECMA
east coast marine area hub

2,500 t a month of structural steel from our own plant, FOB Vietnam or CIF Port of Spain.

The port

An energy port on the Atlantic coast

National Energy runs the Port of Galeota for the East Coast Marine Area fields. Our CIF terms land the steel at Port of Spain; your broker clears it for the drive to Guayaguayare, with bundles sized for the coast road.

Berths5with a 200 m turning basin (InvesTT, 2022)
Warehouses2at the port (InvesTT, 2022)
Serviced lots18with 16 listed as available (InvesTT, 2022)
Sea time≈45 daysVietnamese port to Port of Spain, typical sailing, confirmed at booking

Supply base buildings

What an offshore supply base orders

Supply and service companies on the Galeota lots need a family of buildings around the quay.

Repair workshops

Workshops with crane bays for subsea tools and rental kit.

Overhead cranes

Pipe and tool shelters

Open-sided shelters over pipe racks and laydown.

Equipment shelters

Atlantic exposure

Wind and salt on the south-east tip

Galeota faces the open Atlantic. Your engineer sets the wind basis; we design the frame, cladding fixings and doors to it, and choose coatings for salt spray.

  • Frames and cladding fixings to your wind basis
  • Zinc-rich primer and epoxy coats
  • Galvanized secondary steel on request
  • Wind-rated doors for stores

Port profile

Galeota at a glance, from public reports

What the 2022 InvesTT guide says about the port.

2022

Where

Guayaguayare, Mayaro, south-east Trinidad.

2022

Operator

National Energy Corporation.

2022

Role

Main logistics hub for energy activity in the East Coast Marine Area.

2022

Lots

18 serviced lots for supply and service companies.

Source: InvesTT Investment Guide (2022). Check lots and leases with National Energy.

From our plant

Galvanized frames, bundles and the pack yard

Real World Steel photos from our plant in Vietnam. None is shown as a Galeota site.

Every building is designed to the code basis your engineer of record names, made in an IAS AC472 accredited plant and checked to an inspection plan you agree.

Large-project capacity

Built for the biggest jobs on any Trinidad and Tobago estate

Our own plant in Vietnam fabricates 2,500 t of structural steel a month. These are real World Steel jobs, plus the steel we have already shipped to the Caribbean, erected by the local contractor, our customer.

5,000 tSunpro Steel mill
2,500 tCPV Food plant
2,000 tLong Son oil and gas, 56,000+ m²
2,000 tM&D Warehouse, Thailand
20projects already shipped to Guyana

Questions

Questions on steel buildings at the Port of Galeota

Where is the Port of Galeota?

At Guayaguayare in the Mayaro area of south-east Trinidad, serving the East Coast Marine Area offshore fields, according to public reports.

What does the port offer tenants?

Public reports describe five berths, a 200 m turning basin, two warehouses and 18 serviced lots. Check lots with National Energy.

What buildings does a supply base need?

Bonded stores, repair workshops with cranes, pipe and tool shelters and two-storey base offices.

How do you design for Atlantic wind?

Your engineer of record sets the wind basis; we design the frame, cladding fixings and doors to it and choose coatings for salt spray.

Do you erect the buildings?

No. World Steel designs and fabricates the steel; the local contractor, our customer, erects it.

How does steel reach Galeota?

By sea to Port of Spain, about 45 days from the Vietnamese port on a typical sailing, confirmed at booking, then by road to Guayaguayare. We supply FOB Vietnam or CIF Port of Spain.

Setting up a base at Galeota?

Send the lot, the buildings and your engineer’s wind basis. We design, fabricate and ship CIF Port of Spain.