Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Trinidad and Tobago industrial estates · Union

Steel buildings for the Union Industrial Estate at La Brea

Across the road from La Brea, the Union Industrial Estate covers about 336 ha laid out in 26 lots for light to heavy gas-based industry, beside one of the Caribbean’s largest combined-cycle power plants and a natural gas receiving facility. Plants on these lots need process buildings, shelters and stores. We design them to your engineer’s code basis, fabricate them in our IAS AC472 accredited plant in Vietnam at 2,500 t a month and ship them CIF Port of Spain.

Union, from public reports

336 ha
with buffers and reserves, public reports
26 lots
for light to heavy gas-based industry
16 lots
listed as available in 2022

2,500 t a month of structural steel from our own plant, FOB Vietnam or CIF Port of Spain.

Estate profile

Union at a glance, from public reports

What the 2022 InvesTT guide says about the estate.

2022

Where

Opposite the La Brea Industrial Estate in south-west Trinidad.

2022

Size

About 336 ha, including buffer zones, drainage and utility reserves.

2022

Lots

26 lots: 25 for light to heavy gas-based industry and one for recreation.

2022

Power

Home to the Caribbean’s largest integrated combined-cycle power plant.

2022

Gas

A natural gas receiving facility and a petrochemicals complex.

2022

Port

Served by the Port of Brighton, whose Berth 2 supports methanol exports.

Source: InvesTT Investment Guide (2022), which listed 16 lots as available. Contact National Energy for tenancy.

Light to heavy

One estate, three weights of industry

Union lots take everything from light assembly to heavy gas processing. The steel changes with the load.

Light gas-based industry

Portal frames

Assembly and packaging halls with clear spans and insulated roofs.

Portal frames

Medium industry

Crane bays

Process halls with crane runways and mezzanines for control rooms.

Crane runway beams

Heavy process plants

To the plant spec

Pipe racks, structures and shelters detailed to the plant contractor’s specification.

Heavy industrial plants

Delivery

From the Vietnamese port to a Union lot

Five legs, planned before cutting so the first bundles off the truck are the first members your crew needs.

  1. Our plantFabricated, coated and packed by building and area
  2. Vietnamese portAbout two hours by road
  3. At seaAbout 45 days to Port of Spain, typical sailing
  4. Port of SpainCleared by your broker
  5. Union lotBy road to La Brea

Design basis

Loads a gas-based plant puts on steel

Your engineer of record sets the loads and the code basis. We design and fabricate to them and issue calculations and shop drawings for review.

  • Seismic and wind basis from your engineer
  • Crane, equipment and platform loads combined
  • Coatings for plant fumes and sea air
  • Fire protection on request

From our plant

Stiffened members, fit-up and primed columns

Real World Steel photos from our plant in Vietnam. None is shown as a Union site.

Every building is designed to the code basis your engineer of record names, made in an IAS AC472 accredited plant and checked to an inspection plan you agree.

Large-project capacity

Built for the biggest jobs on any Trinidad and Tobago estate

Our own plant in Vietnam fabricates 2,500 t of structural steel a month. These are real World Steel jobs, plus the steel we have already shipped to the Caribbean, erected by the local contractor, our customer.

5,000 tSunpro Steel mill
2,500 tCPV Food plant
2,000 tLong Son oil and gas, 56,000+ m²
2,000 tM&D Warehouse, Thailand
20projects already shipped to Guyana

Questions

Questions on steel buildings at the Union Industrial Estate

Where is the Union Industrial Estate?

At La Brea in south-west Trinidad, opposite the La Brea Industrial Estate, according to public reports.

How big is the Union estate?

Public reports describe about 336 ha, including buffers and reserves, laid out in 26 lots. Check current lots with National Energy.

What industries use the estate?

Light to heavy gas-based industry, with a combined-cycle power plant, a gas receiving facility and a petrochemicals complex on site.

Which port serves Union?

The Port of Brighton next door. Our CIF terms land steel at Port of Spain, from where it goes by road to La Brea.

Can you supply fire protection?

Yes. Fire protection systems can be applied to the rating your engineer of record sets.

Do you erect the buildings?

No. World Steel designs and fabricates the steel; the local contractor, our customer, erects it.

Building at Union?

Send the lot, the plant layout and your engineer’s code basis. We design, fabricate and ship CIF Port of Spain.