World Steel office, Ho Chi Minh City
Ho Chi Minh City, Vietnam · 2019
Tight urban sites, where pieces arrive in erection order.
Proof of capacity
The engineering problem
Apartments and offices want columns every few meters. Shops want them out of the way. A transfer level solves it, and four other points need agreeing early.
Mixed occupancies raise the fire-resistance ratings the code asks for. The design team specifies them, and we detail and coat the steel to suit.
Apartments and offices feel floor bounce. Floor beams are checked for vibration, not only for strength.
Braced frames or moment frames are placed where the plans of every floor allow, often around stairs and lift cores.
Openings for ducts and risers are set in the beams before fabrication, so no member is cut on site.
From our project files
The three-storey commercial building in the Philippines puts shops along the street in its design, on a steel frame from our plant. The Sun Tower in Ho Chi Minh City shows the heavy members a city-center frame needs.
Photo
Photo
Photo
Photo
Floors people use
Mixed-use buildings stack different uses on one frame. These World Steel frames carry offices, display floors and classrooms; each one opens its project page. Shown for the structure type; none of them is a US site.
Ho Chi Minh City, Vietnam · 2019
Tight urban sites, where pieces arrive in erection order.
Vietnam · 2022
Open display floors and cantilevers, like US showrooms.
Tay Ninh Province, Vietnam · 2023
The frame we trusted for our own people.
Philippines · 2023
Schools in an earthquake-prone country.
Tay Ninh Province, Vietnam · 2019
Composite-style floors on a repeated bay.
Ho Chi Minh City, Vietnam · 2023
Multi-storey industrial floors at a large footprint.
Scope, in writing
World Steel, our plant in Vietnam
The US contractor, our customer
Questions from US contractors
6 answers, grouped by topic.
A transfer level picks up the upper columns on deep beams and carries them to the fewer, wider-spaced columns of the retail floor. Its size is set by the Engineer of Record.
Yes. Floor beams for offices and apartments are checked for vibration as well as strength, to the criteria in the contract documents.
Yes. The plant fabricates 2,500 t of structural steel a month, and members are marked and shipped floor by floor in the erection sequence.
The design team, from the occupancies and the building code. We detail the steel and apply the coating system that the fire protection specification calls for.
To the editions in the contract, typically IBC 2024, ASCE 7-22 and AISC 360, with AISC 341 where seismic detailing applies. Approval and the PE seal stay with your Engineer of Record.
Yes. Street-level shops often get a taller floor for storefronts and signs, and the columns and bracing are designed for that height.
Keep reading
Price it or partner with us
Share the retail and upper-floor plans, the occupancies and the fire protection specification. We will price the frame, the transfer level and the floors.
Why US contractors price with us
2,500 t / month
Own plant capacity, about 2,750 short tons
IAS AC472
Accredited since 2019, audited twice a year
Up to 5,000 t
Largest single job: Sunpro Steel, 2024
Short project form
Tell us about the building
Ask an engineer directly, or drop the basics below. You get a written scope of supply for a US-code building, checked by engineering first.
Or call +84 902 881 833