Sales floor
The widest clear span in the store, often 30 m (100 ft) or more between column lines, so aisles and fixtures can be moved without a column in the way.
Long-span steel structures →
Large-project capacity
World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so the steel package of a large US job runs as one order.
2,500 metric tons a month
Store plan
Tap a zone on the plan to jump to what its steel does.
The widest clear span in the store, often 30 m (100 ft) or more between column lines, so aisles and fixtures can be moved without a column in the way.
Long-span steel structures →Walk-in boxes stand on their own floors, but their refrigeration units sit on the roof. The roof steel and its openings are laid out from the refrigeration plan.
Cold storage building package →Trucks arrive early in the morning, every day. The rear wall carries the dock doors and a canopy, and the back room may hold a mezzanine for offices and storage.
Loading dock canopies →A glass front, a tall parapet with the store sign and a canopy over the entries and the cart corral.
Entrance covers →The heaviest point loads in the building. Units are placed on the frames or on dunnage, never left to the purlins.
HVAC platforms →Coolers and freezers
Cold boxes against an outside wall can wet the steel. Wall and roof build-ups are checked so the frame stays above the dew point.
Members near coolers and wash-down areas get a coating chosen for the exposure, agreed with the owner.
Insulated metal panels on the walls and roof are fixed to girts and purlins spaced for them.
3D model
Photo
Photo
Photo
From our project files
A completed retail store in the US territory of Guam, permitted and built under US codes. World Steel designed and fabricated the steel frame in Vietnam and shipped it in 2023. SKB Marry Mart in Thailand shows the same open sales floor at a different scale.
See the Cost U Less projectScope, in writing
World Steel, our plant in Vietnam
The US contractor, our customer
Questions from US contractors
6 answers, grouped by topic.
Spans of 30 m (100 ft) and more between column lines are common, and wider spans are possible with deeper frames. The span is chosen with the store layout, not as a fixed value.
Yes. The plant fabricates 2,500 t of structural steel a month, so a chain can order store after store from one fabricator with the same detailing.
Yes. The Cost U Less Supermarket in Guam, a US territory, was designed to US codes and its steel was fabricated in our plant in Vietnam in 2023.
Yes, when the mechanical engineer gives us the weights and positions before design. Units sit on frames or dunnage, and the openings are framed.
Tell us before fabrication. Moving a heavy unit changes the roof framing, so the change is checked by design before members are cut.
By checking the wall and roof build-ups for condensation and choosing a coating for the exposure. The envelope design stays with the design team.
Keep reading
Price it or partner with us
Share the floor plan, the refrigeration racks and the rooftop units. We will carry them in the frame and price the steel store by store.
Why US contractors price with us
2,500 t / month
Own plant capacity, about 2,750 short tons
IAS AC472
Accredited since 2019, audited twice a year
Up to 5,000 t
Largest single job: Sunpro Steel, 2024
Short project form
Tell us about the building
Ask an engineer directly, or drop the basics below. You get a written scope of supply for a US-code building, checked by engineering first.
Or call +84 902 881 833