Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Retail centers

Retail centers: one frame, many storefronts

A retail center is leased bay by bay, so the steel has to suit an anchor, a row of inline shops and a pad building on the same site. Our plant fabricates 2,500 t of structural steel a month, so every building on a center ships from one fabricator, in the order the US contractor erects them.

Steel framing for a 7-Eleven commercial building in Thailand during erection, about 791 metric tons supplied by World Steel

Large-project capacity

A whole center, every building, from one plant

World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so the steel package of a large US job runs as one order.

2,500 metric tons a month

ProjectSectorWhereStructural steel
Sunpro Steel FactorySteel industryCan Tho City, Vietnam · 20245,000 t
CPV Food Processing FactoryFood processingDong Nai Province, Vietnam · 20202,500 t
Long Son petrochemicalOil and gasBa Ria–Vung Tau, Vietnam · 20222,000 t
M&D warehouse, ThailandWarehouse and industrialThailand · 20242,000 t
Tongwei feed factory, phase 1Animal feedDong Thap Province, Vietnam · 20181,500 t
New Era cold storage, phase 1Cold storage, phase 1 tonnageTay Ninh Province, Vietnam1,000 t

Read the elevation

Four kinds of tenant, four jobs for the steel

Pick a tenant type. The bays it leases light up on the drawing.

ANCHOR INLINE SHOPS END CAP PAD COLUMNS ON THE DEMISING LINES · CONTINUOUS CANOPY IN RED

Anchor store

A large box with the widest spans on the center, a tall front parapet and the heaviest rooftop units. It usually has its own loading dock at the back.

We supply: Clear-span or long-bay frames, a raised front parapet, roof steel for rooftop units, and dock framing at the rear

Long-span steel structures →

Inline shops

A row of small bays, typically 6 to 9 m (20 to 30 ft) wide, that are leased, split and combined many times over the life of the center.

We supply: A regular column grid on the demising lines, storefront framing that suits several tenant widths, and a continuous canopy

Storefront canopies →

End cap with a drive-thru

The end bay often goes to a restaurant or a coffee shop, with a drive-thru window, a patio cover and a heavier kitchen exhaust on the roof.

We supply: Framed openings for the drive-thru window, a patio or menu-board canopy, and roof framing for the hood fans

Entrance covers →

Pad building

A stand-alone building near the road, seen from all four sides, so every wall is a front and the roof screen is part of the design.

We supply: A compact frame with four finished elevations, a rooftop equipment screen, and canopy steel at the entries

Architectural steel features →

Front to back

Walk through a retail building from the storefront to the service door

Five places where a retail frame differs from a warehouse frame. Each is cheaper to design in than to fix in the field.

  1. Storefront

    Glass storefronts leave little wall to brace. Wind is taken by rigid frames or moment bays at the front, and drift is checked so the glazing stays tight.

  2. Demising lines

    Columns sit on the lines between tenants, so a wall can move later without a column standing in the middle of a shop.

  3. Parapet and signs

    Tall front parapets carry the tenant signs. Their framing and the sign loads are in the frame design from the start.

  4. Rooftop units

    Every tenant brings its own HVAC unit. Roof framing is laid out so units can be added per tenant without reframing the roof.

  5. Service side

    The rear wall carries service doors, the anchor dock and sometimes a screen wall. It is braced where the front cannot be.

From our project files

7-Eleven, Thailand: about 791 t for a retail chain

Chains repeat their layouts store after store. The 7-Eleven work in Thailand shows how a retail program can source its framing from one plant, with members marked and bundled per building.

See the 7-Eleven project
Fabricated steel members with end plates for the 7-Eleven project in the World Steel plant Photo
Primed steel members for the 7-Eleven project stacked in the World Steel plant Photo
Bundled steel members for Chumpon Market loaded at the World Steel plant Photo
Roof frames and purlins of the Marko Khonkaen commercial building in Thailand Photo

Scope, in writing

What we supply and what stays with your team

World Steel, our plant in Vietnam

  • Frame, canopy and roof steel for every building on the center, designed to the contract documents
  • A column grid on the demising lines and storefront framing for changing tenant widths
  • Shop and erection drawings at no extra cost, ready for your Engineer of Record
  • Fabrication in our IAS AC472-accredited plant in Vietnam, one shipping sequence per building

The US contractor, our customer

  • Drawing approval, the PE seal and the permit with your Engineer of Record
  • Storefront glazing, signs and tenant fit-out
  • Foundations, paving and site utilities
  • Erection, roofing and the rooftop units

Questions from US contractors

Retail center steel: questions and answers

6 answers, grouped by topic.

Center layout 3 answers

How wide are inline shop bays in a strip center?

Often 6 to 9 m (20 to 30 ft) wide. We set the column grid on the demising lines so tenants can be split or combined later. These are typical ranges, not design values.

Can one fabricator supply the anchor, the inline shops and the pad buildings?

Yes. The plant fabricates 2,500 t of structural steel a month, so every building on a center can ship as one program, each with its own erection sequence.

Can the frame allow for tenants we do not know yet?

Yes, within limits the owner sets. We design the roof for a rooftop unit allowance per bay and keep columns off the shop floors, and the Engineer of Record agrees the allowances.

Storefront and roof 3 answers

How is a glass storefront braced against wind?

With rigid frames or moment-connected bays at the front instead of wall bracing, and a drift check so the glazing system stays within its limits.

Do you design the parapet and sign framing?

Yes, when the sign loads and heights are in the contract documents. Parapet framing is shown on the same drawings as the main frame.

Can you supply the canopy along the storefronts?

Yes. Continuous or tenant-by-tenant canopies are designed with the frame and fabricated in the same order.

Keep reading

Related pages

Price it or partner with us

Send the site plan and the tenant mix.

Share the elevations, the bay widths and the anchor requirements. We will price the steel for every building on the center.

Why US contractors price with us

2,500 t / month

Own plant capacity, about 2,750 short tons

IAS AC472

Accredited since 2019, audited twice a year

Up to 5,000 t

Largest single job: Sunpro Steel, 2024

See our largest jobs →

Short project form

Tell us about the building

Ask an engineer directly, or drop the basics below. You get a written scope of supply for a US-code building, checked by engineering first.

Or call +84 902 881 833

Or leave your project details