Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Showrooms

Showrooms: the steel stays out of the picture

A showroom sells what is on the floor, so the frame has to step back: a tall glass front, a floor without columns and a mezzanine that looks light. Our plant fabricates 2,500 t of structural steel a month, so a dealer group opening several locations can order every building from one fabricator.

Multi-storey steel frame of the Hai Trung furniture showroom in Vietnam, fabricated by World Steel

Hai Trung Furniture Showroom and Model House CenterVietnam, 2022Display floors stacked in a braced steel frame, before cladding.

Large-project capacity

One fabricator for every location of a dealer group

World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so the steel package of a large US job runs as one order.

2,500 metric tons a month

Seen and unseen

What the buyer sees, and what the steel does behind it

Hover or tap a card to turn it over.

The buyer sees

A glass front, floor to roof

The steel does

Rigid frames or moment bays carry the wind where there is no wall to brace, with drift checked for the glazing.

The buyer sees

An open floor with room to turn a vehicle

The steel does

Clear-span frames keep columns off the display floor and the turning paths.

The buyer sees

A mezzanine that seems to float

The steel does

A display mezzanine on slender columns or hung from the roof, with guards and an open stair.

The buyer sees

Even light and tidy ceilings

The steel does

Purlins and hanger points laid out for track lighting, signs and exposed services.

The buyer sees

A drive-in door for the product

The steel does

A framed opening wide and tall enough to bring an RV, a boat or a machine onto the floor.

Showroom types

Different products, different frames

Equipment and machinery

Heavy products on the floor, sometimes an overhead crane for moving them.

Crane runway beams →

From our project files

A US camper center and a multi-floor furniture showroom

Apache Camper Center in the United States, finished in 2023, is a camper sales and service building on a pre-engineered steel frame with wide clear spans. Hai Trung in Vietnam stacks display floors and model rooms in a braced steel frame.

Rendering of the Apache Camper Center showroom and service building in the United States 3D model
Rendering of the Apache Camper Center steel frame being erected with a crane 3D model
Aerial view of the Hai Trung furniture showroom steel frame with roof sheeting Photo
Underside of a steel display floor with beams and decking in the Hai Trung showroom Photo

Scope, in writing

What we supply and what stays with your team

World Steel, our plant in Vietnam

  • Frame, mezzanine, stair and canopy steel designed to the contract documents
  • Glass-front framing with drift checked for the glazing system
  • Shop and erection drawings at no extra cost, ready for your Engineer of Record
  • Fabrication in our IAS AC472-accredited plant in Vietnam, tracked live in PEB Studio

The US contractor, our customer

  • Drawing approval, the PE seal and the permit with your Engineer of Record
  • Storefront glazing, finishes and the interior design
  • Foundations, the floor slab and site work
  • Erection, cladding, doors and fit-out

Questions from US contractors

Showroom steel: questions and answers

6 answers, grouped by topic.

Glass and open floors 3 answers

Can a showroom have a full-height glass front?

Yes. The wind is carried by rigid frames or moment bays instead of wall bracing, and the frame drift is checked against the limits of the glazing system.

How wide can a showroom floor be without columns?

Clear spans of 30 m (100 ft) and more are common in steel. The span is set with the display layout and the turning paths, not as a fixed value.

Can the steel be left exposed inside?

Yes. Exposed members are detailed with neat connections and a finish coat chosen with the designer, and fire protection is specified by the design team where the code requires it.

Dealers and groups 3 answers

Do you have a US showroom reference?

Yes. Apache Camper Center in the United States was finished in 2023 on a pre-engineered steel frame from our plant, with wide clear spans for campers.

Can the showroom and the service building ship together?

Yes. They can ship as one order with a separate erection sequence for each building.

Can a dealer group order several locations?

Yes. The plant fabricates 2,500 t of structural steel a month, so a group can roll out several sites with the same details.

Keep reading

Related pages

Price it or partner with us

Send the showroom plan and the front elevation.

Share the display layout, the glass front and the product sizes that must come through the door. We will price the frame, the mezzanine and the canopies.

Why US contractors price with us

2,500 t / month

Own plant capacity, about 2,750 short tons

IAS AC472

Accredited since 2019, audited twice a year

Up to 5,000 t

Largest single job: Sunpro Steel, 2024

See our largest jobs →

Short project form

Tell us about the building

Ask an engineer directly, or drop the basics below. You get a written scope of supply for a US-code building, checked by engineering first.

Or call +84 902 881 833

Or leave your project details