Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Dominican Republic industrial estates · Haina–Nigua

Steel buildings for the Haina–Nigua industrial district

Haina and Nigua, in San Cristóbal province, form the industrial district around the Port of Haina. It was certified as an industrial district in 2022 and public reports in 2023 counted 3,026 companies there, from plants and free-zone parks to new logistics parks. Firms here need process halls, warehouses and crane bays. We design them to your engineer’s code basis, fabricate them in our IAS AC472 accredited plant in Vietnam at 2,500 t a month and ship them FOB Vietnam or CIF Caucedo.

Haina–Nigua, from public reports

2022
district certified
3,026
companies, public reports
Haina
port next to the district

2,500 t a month of structural steel from our own plant, FOB Vietnam or CIF Caucedo.

District profile

The Haina–Nigua district at a glance

What 2020 and 2023 press reports say about the district.

Diario Libre, 2023

Where

Haina and Nigua, San Cristóbal province, west of Santo Domingo.

Diario Libre, 2023

Status

Certified as an industrial district on 9 February 2022.

Diario Libre, 2023

Companies

3,026 companies in the district.

El Dinero, 2020

New parks

Global Industrial & Logistic Park in Nigua, planned at 140,000 m².

Sources: Diario Libre (19 April 2023), El Dinero (2 November 2020). Check plots and leases with each park’s operator.

Buildings

Steel for a working port district

What Haina–Nigua firms order, each linked to the World Steel package or product behind it.

Park layouts

Buildings for a new logistics park plot

Illustrative layouts for a plot of about 2.5 ha in a park like the one planned in Nigua. We set the real one to the park plan and your engineer’s basis.

Multi-tenant warehouse

60 m × 168 m (197 × 551 ft)

10,080 m², split into tenant bays

Crane-bay workshop

30 m × 90 m (98 × 295 ft)

2,700 m² with a 10 t overhead crane

Port cargo shed

42 m × 120 m (138 × 394 ft)

5,040 m² open on one side for forklifts

Heavy industry

Frames for cranes, plant and port air

Plants near the port carry cranes, heavy plant and salt-laden air. We design crane bays to the crane data, supply cranes with the building on request and pick coatings or galvanizing for the exposure your engineer sets.

  • Crane bays designed to the crane data
  • Overhead cranes supplied on request
  • Coatings or galvanizing for port air
  • Seismic and wind basis set by your engineer

Delivery

From the Vietnamese port to San Cristóbal

Our CIF terms land the steel at Caucedo. From there it runs west past the capital to Haina and Nigua by road.

  1. Our plantPacked in erection order
  2. Vietnamese portAbout two hours by road
  3. At seaAbout 45 days to Caucedo, typical sailing
  4. CaucedoCleared by your broker
  5. Haina–NiguaWest by road to the plot

From our plant

Crane columns, galvanized frames and base plates

Real World Steel photos from our plant and projects in Vietnam. None is shown as a Haina–Nigua site.

1
1
1
1

Every building is designed to the code basis your engineer of record names, made in an IAS AC472 accredited plant and checked to an inspection plan you agree.

Large-project capacity

Built for the biggest jobs on any Dominican Republic estate

Our own plant in Vietnam fabricates 2,500 t of structural steel a month. These are real World Steel jobs, plus the steel we have already shipped to the Caribbean, erected by the local contractor, our customer.

5,000 tSunpro Steel mill
2,500 tCPV Food plant
2,000 tLong Son oil and gas, 56,000+ m²
2,000 tM&D Warehouse, Thailand
20projects already shipped to Guyana

Questions

Questions on steel buildings in the Haina–Nigua district

Where is the Haina–Nigua industrial district?

In Haina and Nigua, San Cristóbal province, around the Port of Haina west of Santo Domingo.

How many companies are there?

Public reports in 2023 counted 3,026 companies in the district, which was certified as an industrial district in February 2022.

Do you build crane bays?

We design and fabricate crane bays and runway beams to the crane data, and supply overhead cranes with the building on request.

Can the steel be galvanized?

Yes. Your engineer sets the exposure; we supply a matching coating system or hot-dip galvanized members.

Do you erect the buildings?

No. World Steel designs and fabricates the steel; the local contractor, our customer, erects it.

How does steel reach Haina–Nigua?

By sea to Caucedo, about 45 days from the Vietnamese port on a typical sailing, confirmed at booking, then west by road. We supply FOB Vietnam or CIF Caucedo.

Building in the Haina–Nigua district?

Send the plot, the use and your engineer’s code basis. We design, fabricate and ship CIF Caucedo.