Where
Santiago de los Caballeros, the main city of the Cibao valley.
Since 1974
How the Santiago park grew, from public reports.
Corporación Zona Franca Santiago is set up.
In about 200 buildings, with 20,000 jobs.
Land planned to grow from 700,000 to 2,000,000 m².
The Cibao holds 46 of the country’s 94 free-zone parks.
Sources: El Dinero (7 February 2019), Site Selection (2019), CNZFE 2024 statistics via El Dinero (2025).
Park profile
What public reports say about the park. Figures differ between sources, so we show each with its year.
Santiago de los Caballeros, the main city of the Cibao valley.
About 90 companies in about 200 buildings; Site Selection counted more than 80 the same year.
Tobacco and cigars, textiles and apparel, and medical products.
Growing from 700,000 to 2,000,000 m².
Sources: El Dinero (2019), Site Selection (2019). Check lots and leases with the park’s operator.
Buildings
What Santiago tenants build, each linked to the World Steel package behind it.
Curing and rolling
Ventilated halls with steel for humidity control plant.
Manufacturing plantsCutting and sewing
Wide clear spans for sewing lines and daylight roofs.
Long-span steel structuresAssembly and packing
Halls with mezzanines for clean rooms and plant.
Steel mezzanine framesExport staging
Stores for goods waiting for the run to the port.
Warehouse buildingsDelivery
Our CIF terms land the steel at Caucedo on the south coast. From there it travels north by road to Santiago, so bundles are sized for highway trucks.
Earthquakes
The Cibao valley lies on an active fault zone. Your engineer sets the seismic basis; we design light steel frames, ductile connections and bracing to it, and the drawings show every detail your reviewer checks.
From our plant
Real World Steel photos from our plant and projects in Vietnam. None is shown as a Santiago site.
Every building is designed to the code basis your engineer of record names, made in an IAS AC472 accredited plant and checked to an inspection plan you agree.
Dominican Republic industrial estates
Each estate has its own lots, ground and tenants, so each has its own guide.
Large-project capacity
Our own plant in Vietnam fabricates 2,500 t of structural steel a month. These are real World Steel jobs, plus the steel we have already shipped to the Caribbean, erected by the local contractor, our customer.
Questions
In Santiago de los Caballeros, the main city of the Cibao valley in the north of the country.
Reports in 2019 counted about 90 companies in about 200 buildings and 20,000 jobs, with land planned to grow from 700,000 to 2,000,000 m². Check lots with the park’s operator.
Tobacco and cigars, textiles and apparel, and medical products, among others.
By sea to Caucedo, about 45 days from the Vietnamese port on a typical sailing, confirmed at booking, then north by road. We supply FOB Vietnam or CIF Caucedo.
Yes. Your engineer of record sets the seismic basis; we design the frame, connections and bracing to it.
No. World Steel designs and fabricates the steel; the local contractor, our customer, erects it.
Send the lot, the use and your engineer’s code basis. We design, fabricate and ship CIF Caucedo.