Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Dominican Republic industrial estates · Caucedo Economic Zone

Steel warehouses for the Caucedo Economic Zone

The Caucedo Economic Zone sits inside DP World’s logistics park at the Port of Caucedo, which handled 1.7 million TEU in 2024. DP World reports zone occupancy up 39% and warehouses from 500 m², with land set aside for build-to-suit buildings. Tenants need stores and light factories that load from the quay. We design them to your engineer’s code basis, fabricate them in our IAS AC472 accredited plant in Vietnam at 2,500 t a month and ship them CIF Caucedo, to the port beside the lot.

Caucedo, from public reports

1.7 M TEU
handled at Caucedo in 2024
+39%
zone occupancy growth (2025)
2003
year operations began

2,500 t a month of structural steel from our own plant, FOB Vietnam or CIF Caucedo.

Port of Caucedo

The zone and the quay share one gate

On CIF Caucedo our steel lands at the same port that hosts the zone. Your broker clears it and it moves a few hundred metres to the lot. Bundles are labelled by building and area so a crew can unload in erection order.

Throughput1.7 M TEUhandled at Caucedo in 2024 (DP World, 2025)
Capacity2.25 M TEUplanned port capacity (DP World, 2025)
Sea time≈45 daysVietnamese port to Caucedo, typical sailing, confirmed at booking
Plant to port≈2 hby road from our plant to the Vietnamese port

Port to zone

Two decades from container port to economic zone

How the port grew a logistics zone beside its quay, from public reports.

  1. 2003

    Port opens

    DP World’s Port of Caucedo begins operations at Punta Caucedo.

  2. 2019

    Build-to-suit land

    About 100 acres are set aside for build-to-suit warehouses.

  3. 2024

    1.7 M TEU

    The port’s busiest year so far.

  4. 2025

    +39% occupancy

    DP World reports occupancy growth in the economic zone.

Sources: DP World (news of 11 December 2025 and port pages), Site Selection (2019).

Warehouse sizes

From a 500 m² unit to a build-to-suit hub

Illustrative sizes. DP World leases from 500 m²; we size the steel to the unit or plot you hold and your engineer’s basis.

Small unit block

30 m × 72 m (98 × 236 ft)

2,160 m², split into units of about 540 m²

Distribution hub

60 m × 144 m (197 × 472 ft)

8,640 m² with docks on both long sides

Cold store

42 m × 96 m (138 × 315 ft)

4,030 m² with chilled and frozen rooms

Buildings

Buildings for a port-side economic zone

What Caucedo tenants order, each linked to the World Steel package behind it.

Dock doors and canopies

Rolling doors and canopies at every loading bay.

Steel canopies

Coastal weather

Built for a hurricane coast and sea spray

Punta Caucedo faces the Caribbean Sea. Your engineer sets the wind and seismic basis; we design the frame, cladding fixings and doors to it and pick coatings for salt air.

  • Frames and cladding to your wind basis
  • Seismic basis set by your engineer
  • Zinc-rich primer and epoxy coats
  • Wind-rated dock doors

From our plant

Aerial plant, red frames, blasting and bundles

Real World Steel photos from our plant in Vietnam. None is shown as a Caucedo site.

1
1
1
1

Every building is designed to the code basis your engineer of record names, made in an IAS AC472 accredited plant and checked to an inspection plan you agree.

Large-project capacity

Built for the biggest jobs on any Dominican Republic estate

Our own plant in Vietnam fabricates 2,500 t of structural steel a month. These are real World Steel jobs, plus the steel we have already shipped to the Caribbean, erected by the local contractor, our customer.

5,000 tSunpro Steel mill
2,500 tCPV Food plant
2,000 tLong Son oil and gas, 56,000+ m²
2,000 tM&D Warehouse, Thailand
20projects already shipped to Guyana

Questions

Questions on steel warehouses at the Caucedo Economic Zone

Where is the Caucedo Economic Zone?

At Punta Caucedo near Boca Chica, inside DP World’s logistics park at the Port of Caucedo, according to DP World.

How busy is the port?

DP World reports 1.7 million TEU handled in 2024 and plans capacity of 2.25 million TEU.

How small a warehouse can a tenant lease?

DP World leases warehouses from 500 m². Larger plots are offered for build-to-suit buildings; check space with DP World.

What buildings do you supply for the zone?

Bonded warehouses, cold stores, light assembly halls, dock canopies and doors.

Do you design for hurricanes and earthquakes?

Yes. Your engineer of record sets the wind and seismic basis; we design the frame, cladding fixings and doors to it.

Do you erect the buildings?

No. World Steel designs and fabricates the steel; the local contractor, our customer, erects it.

How does steel reach the zone?

By sea to Caucedo, about 45 days from the Vietnamese port on a typical sailing, confirmed at booking. We supply FOB Vietnam or CIF Caucedo.

Building at the Caucedo Economic Zone?

Send the plot, the use and your engineer’s code basis. We design, fabricate and ship CIF Caucedo.