Small unit block
30 m × 72 m (98 × 236 ft)
2,160 m², split into units of about 540 m²
Port of Caucedo
On CIF Caucedo our steel lands at the same port that hosts the zone. Your broker clears it and it moves a few hundred metres to the lot. Bundles are labelled by building and area so a crew can unload in erection order.
Port to zone
How the port grew a logistics zone beside its quay, from public reports.
DP World’s Port of Caucedo begins operations at Punta Caucedo.
About 100 acres are set aside for build-to-suit warehouses.
The port’s busiest year so far.
DP World reports occupancy growth in the economic zone.
Sources: DP World (news of 11 December 2025 and port pages), Site Selection (2019).
Warehouse sizes
Illustrative sizes. DP World leases from 500 m²; we size the steel to the unit or plot you hold and your engineer’s basis.
30 m × 72 m (98 × 236 ft)
2,160 m², split into units of about 540 m²
60 m × 144 m (197 × 472 ft)
8,640 m² with docks on both long sides
42 m × 96 m (138 × 315 ft)
4,030 m² with chilled and frozen rooms
Buildings
What Caucedo tenants order, each linked to the World Steel package behind it.
Clear-span stores for goods moving through the port.
Warehouse buildingsInsulated rooms for food and pharma in transit.
Cold storage buildingsHalls for kitting, labelling and light manufacturing.
Manufacturing plantsRolling doors and canopies at every loading bay.
Steel canopiesCoastal weather
Punta Caucedo faces the Caribbean Sea. Your engineer sets the wind and seismic basis; we design the frame, cladding fixings and doors to it and pick coatings for salt air.
From our plant
Real World Steel photos from our plant in Vietnam. None is shown as a Caucedo site.
Every building is designed to the code basis your engineer of record names, made in an IAS AC472 accredited plant and checked to an inspection plan you agree.
Dominican Republic industrial estates
Each estate has its own lots, ground and tenants, so each has its own guide.
Large-project capacity
Our own plant in Vietnam fabricates 2,500 t of structural steel a month. These are real World Steel jobs, plus the steel we have already shipped to the Caribbean, erected by the local contractor, our customer.
Questions
At Punta Caucedo near Boca Chica, inside DP World’s logistics park at the Port of Caucedo, according to DP World.
DP World reports 1.7 million TEU handled in 2024 and plans capacity of 2.25 million TEU.
DP World leases warehouses from 500 m². Larger plots are offered for build-to-suit buildings; check space with DP World.
Bonded warehouses, cold stores, light assembly halls, dock canopies and doors.
Yes. Your engineer of record sets the wind and seismic basis; we design the frame, cladding fixings and doors to it.
No. World Steel designs and fabricates the steel; the local contractor, our customer, erects it.
By sea to Caucedo, about 45 days from the Vietnamese port on a typical sailing, confirmed at booking. We supply FOB Vietnam or CIF Caucedo.
Send the plot, the use and your engineer’s code basis. We design, fabricate and ship CIF Caucedo.