Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Dominican Republic industrial estates · Zona Franca Las Américas

Steel buildings for Zona Franca Las Américas

Zona Franca Las Américas is a private free-zone park east of Santo Domingo with close to a million m² of land. Public reports in 2026 say every building it has put up is let, and a new 14,000 m² logistics building is under way. Its medical device, electronics and plastics tenants grow in phases and need halls that are ready fast. We design them to your engineer’s code basis, fabricate them in our IAS AC472 accredited plant in Vietnam at 2,500 t a month and ship them CIF Caucedo.

Las Américas, from public reports

≈1 M m²
of land, public reports
100%
of built buildings occupied (2026)
14,000 m²
new logistics building

2,500 t a month of structural steel from our own plant, FOB Vietnam or CIF Caucedo.

Park profile

Zona Franca Las Américas at a glance

What 2023 and 2026 press reports say about the park.

El Dinero, 2026

Where

Santo Domingo Este, on the eastern side of the capital, the same side as the Port of Caucedo.

El Dinero, 2026

Land

Close to one million m², with 20 to 24% of the land still free to build on.

El Dinero, 2026

Occupancy

Every building the park has put up is occupied.

Revista Mercado, 2023

Tenants

Medical devices, electronics and plastic injection moulding, among others.

Sources: El Dinero (July 2026), Revista Mercado (2023). Check lots and leases with the park’s operator.

Lot layouts

Export halls sized for a free-zone lot

Illustrative layouts for a lot of about 1.5 ha. We set the real one to the park’s rules, your process and your engineer’s basis.

Assembly hall

48 m × 120 m (157 × 394 ft)

5,760 m² clear span for assembly lines

Clean-room plant

36 m × 96 m (118 × 315 ft)

3,460 m² with a mezzanine plant deck

Logistics building

60 m × 110 m (197 × 361 ft)

6,600 m² with docks on one long side

Buildings

What Las Américas tenants build

Each building type links to the World Steel package behind it.

Device and electronics plants

Clear-span halls with steel for process lines and services.

Manufacturing plants

Clean rooms

Steel frames that carry a clean room

Medical device makers fit clean rooms, air handling and services inside the hall. We design the roof and mezzanine steel for those loads and leave the clean-room fit-out to your specialist.

  • Roof steel sized for air handling units
  • Mezzanine decks above the clean rooms
  • Deflection limits set with your engineer
  • Interior coatings that clean easily

Delivery

From the Vietnamese port to Las Américas

Steel lands at Caucedo on the same side of the capital as the park, so the last leg is a short road run.

  1. Our plantPacked in erection order
  2. Vietnamese portAbout two hours by road
  3. At seaAbout 45 days to Caucedo, typical sailing
  4. CaucedoCleared by your broker
  5. Park lotA short road run west

From our plant

Factory frames, inspection and packed members

Real World Steel photos from our plant and projects in Vietnam. None is shown as a Las Américas site.

1
1
1
1

Every building is designed to the code basis your engineer of record names, made in an IAS AC472 accredited plant and checked to an inspection plan you agree.

Large-project capacity

Built for the biggest jobs on any Dominican Republic estate

Our own plant in Vietnam fabricates 2,500 t of structural steel a month. These are real World Steel jobs, plus the steel we have already shipped to the Caribbean, erected by the local contractor, our customer.

5,000 tSunpro Steel mill
2,500 tCPV Food plant
2,000 tLong Son oil and gas, 56,000+ m²
2,000 tM&D Warehouse, Thailand
20projects already shipped to Guyana

Questions

Questions on steel buildings at Zona Franca Las Américas

Where is Zona Franca Las Américas?

In Santo Domingo Este, on the eastern side of the capital, according to public reports.

Is there still space in the park?

Public reports in 2026 say every built building is occupied and 20 to 24% of the land is still free. Check lots with the park’s operator.

What do tenants make there?

Medical devices, electronics and plastic injection moulding, among others, according to a 2023 report.

Can you design for clean rooms?

Yes. We design the roof and mezzanine steel for air handling and services; the clean-room fit-out is done by your specialist.

Which code do you design to?

To the code basis your engineer of record names. Your engineer approves and seals the design.

Do you erect the buildings?

No. World Steel designs and fabricates the steel; the local contractor, our customer, erects it.

How does steel reach the park?

By sea to Caucedo, about 45 days from the Vietnamese port on a typical sailing, confirmed at booking, then a short road run. We supply FOB Vietnam or CIF Caucedo.

Building at Zona Franca Las Américas?

Send the lot, the process and your engineer’s code basis. We design, fabricate and ship CIF Caucedo.