Design step: design basis

One signed sheet before a single member is sized

Code edition, local amendments, risk category, loads, deflection limits, steel grades and coating are written into one design criteria sheet. You or your Engineer of Record confirm it, and from then on every calculation, drawing and change refers back to the same page.

Field by field

What goes on the design criteria sheet

This is the sheet our engineers fill in for a typical US metal building or structural steel frame. We publish no site values here, because every one of them depends on the parcel and the risk category.

Code and jurisdiction

Building code edition The IBC edition the jurisdiction enforces on the permit date, which may lag the latest edition by a cycle. Building department website or the Engineer of Record
State and local amendments State codes built on the IBC, such as California’s CBC or the Florida Building Code, plus any city or county amendments. Adopting ordinance
Referenced standards The ASCE 7, AISC 360 and AISI S100 editions that the adopted IBC references, so loads and member checks come from matching editions. IBC Chapter 35
Risk category I to IV from IBC Table 1604.5, set by occupancy and by how many people the building holds. It changes wind, snow and seismic demand. Owner brief and Engineer of Record

Wind

Basic wind speed From the ASCE 7-22 maps for the site coordinates and the risk category. ASCE Hazard Tool
Exposure category B, C or D from the surface roughness upwind of the site, checked in each direction. Site survey and aerial imagery
Topographic and elevation factors Kzt for hills and escarpments, and Ke for ground elevation, which lowers velocity pressure on high-altitude sites. Site topography
Enclosure classification Enclosed, partially enclosed, partially open or open. Large overhead doors can change it. Architectural drawings
Tornado loads For Risk Category III and IV buildings in the tornado-prone region, ASCE 7-22 Chapter 32 tornado loads are checked alongside wind. ASCE 7-22 tornado maps

Snow and rain

Ground snow load From the ASCE 7-22 ground snow maps, which are now set by risk category, or from the state or county value where one is published. ASCE Hazard Tool or local snow study
Exposure and thermal factors Ce for wind exposure of the roof, Ct for heated, unheated or freezer buildings. Use and surroundings
Drift, sliding and unbalanced snow Drift at roof steps, parapets and adjacent buildings, sliding snow onto lower roofs, and rain-on-snow where it applies. Roof geometry
Rain and ponding Design rainfall, the secondary drainage path and a ponding check for low-slope roofs. Plumbing design and ASCE 7 Chapter 8

Seismic

Mapped ground motions Design spectral accelerations from ASCE 7-22 for the site coordinates. ASCE Hazard Tool
Site class From the geotechnical report, using the finer site classes ASCE 7-22 introduced. Geotechnical engineer
Seismic Design Category A to F from the risk category and the design accelerations. It decides which framing systems are allowed and whether AISC 341 detailing applies. Derived and confirmed
Seismic force-resisting system Ordinary or intermediate moment frames, or braced frames, with their R, Cd and overstrength factors in each direction. ASCE 7-22 Table 12.2-1

Gravity and collateral loads

Dead load Self-weight of steel, sheeting and insulation, computed from the model. Model
Collateral load Ceilings, sprinklers, lighting, ducts and solar panels as a uniform value, with heavier items as point loads. Owner and MEP engineers
Roof live load 0.96 kN/m² (20 psf) under ASCE 7, reduced by tributary area where the code allows. ASCE 7 Chapter 4
Floor, mezzanine and crane loads Floor use, mezzanine live load, crane capacity, wheel loads, impact and service class. Owner and crane supplier

Serviceability

Roof deflection Vertical deflection limits for rafters and purlins under live, snow and wind, agreed for the roof and ceiling types. Engineer of Record
Frame drift Lateral drift limits under serviceability wind, tighter where masonry, glazing or cranes are attached. AISC Design Guide 3 as a starting point
Crane runway limits Vertical and lateral runway deflection limits for the crane service class. AISC Design Guide 7 and crane supplier
Vibration Floor vibration criteria for mezzanines and office floors where people walk or equipment runs. AISC Design Guide 11

Materials, coating and fire

Plate and sections Steel grades specified to ASTM, for example A572 Grade 50 for built-up plate members, A992 for wide-flange sections and A500 Grade C for hollow sections. Specification
Cold-formed members Purlins and girts in galvanized or uncoated sheet steel, specified to ASTM A653 or A1011 grades. Specification
Bolts and anchor rods Structural bolts to ASTM F3125 and anchor rods to ASTM F1554, with grade and finish stated. Connection design and foundation engineer
Coating system Surface preparation, primer and finish, or hot-dip galvanizing to ASTM A123, chosen for the exposure inside and outside. Owner and specification
Fire resistance Any rated assembly and who supplies the protection, so steel sizes and coatings suit it. Architect

Foundation interface

Base fixity Pinned or fixed column bases, chosen with the soil conditions and the foundation cost in mind. Geotechnical report and foundation engineer
Reaction format Unfactored reactions by load case, in kN with kips alongside, in the format your foundation engineer asks for. Foundation engineer

Why one sheet

The cheapest place to fix a load is on paper

Codes differ by address

The same building is designed differently in Miami-Dade, in a California county with high seismic demand and in a Colorado town with its own snow load table. The sheet records which rules apply to this parcel.

Every calculation points back to it

Load cases in the analysis, notes on the drawings and the Design Report all quote the same values, so a reviewer checks one page instead of a hundred.

Frozen before the model is built

Once confirmed, the sheet is frozen. A later change of load or code is logged as a change, with its effect on steel and schedule stated before anyone redraws.

Sign-off

From draft to frozen basis

Our engineer drafts the sheet from the site address, the documents in the RFQ and the code the jurisdiction enforces. Your Engineer of Record marks it up or confirms it. When both sides agree, the sheet is frozen and carries a revision like any drawing.

From that moment, every load case in the analysis model, every general note on the approval drawings and every page of the Design Report quotes the sheet. If the owner later adds solar panels or a heavier crane, the change goes back onto the sheet first, then into the model.

Designed to, not certified to

How we describe standards

The steel is designed to the codes and standards on the sheet: IBC, ASCE 7, AISC 360, AISI S100 and the MBMA practice for metal building systems. Approval of the design for your permit belongs to your Engineer of Record and the building official. World Steel’s design and fabrication process is accredited under IAS AC472.

Standards center

Who owns this step

Clear lines between our scope and yours

World Steel designs and fabricates the steel structure. Approval, the PE seal, the permit and the erection stay with the US contractor and the Engineer of Record they appoint.

World Steel

Designs, details and fabricates the steel in Vietnam

Drafts the criteria sheet from the site address, the documents and the code the jurisdiction enforces, and designs every member against it.

Your Engineer of Record

Reviews, approves and seals for your permit

Confirms or corrects the code edition, loads, limits and materials, and signs the sheet off so it becomes the basis of the approval set.

The US contractor, our customer

Submits, builds the foundations and erects

Supplies the owner’s requirements, the geotechnical report and the MEP and crane data, and confirms the code edition with the building department.

Questions from US contractors

Questions about the design basis

Which code edition will you design to?

The one your jurisdiction enforces when the permit is filed. Many places adopt the IBC a cycle late or with amendments, so we confirm the edition with you or your Engineer of Record before the sheet is frozen.

Can you design to ASCE 7-16 instead of ASCE 7-22?

Yes, where the adopted building code still references ASCE 7-16. Load values and some combinations differ between editions, which is why the edition is written on the sheet.

Our engineer wants tighter deflection limits. Is that a problem?

No. Limits are agreed, not imposed. Tighter limits can add steel, and we show the effect so your team can decide where they matter, for example under glazing or a crane.

Do you need a geotechnical report before you start?

It helps but is not required to begin. We assume a site class and pinned bases, state both on the sheet, and recheck when the report arrives.

Does the design basis cover the foundations?

No. Foundation design stays with your foundation engineer. The sheet sets the reaction format and base fixity so our reactions drop straight into their design.

What happens if the loads change after sign-off?

We log the change, rerun the affected checks and tell you in writing what it does to the steel, the drawings and the schedule before anything is redrawn.