Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

North Caicos · District

Steel buildings and structural steel for North Caicos, Turks and Caicos

North Caicos is the greenest of the islands, with farms, ponds full of flamingos and the settlements of Bottle Creek, Kew, Whitby and Sandy Point, linked to Middle Caicos by causeway.

The Caicos Islands · Main settlement Bottle Creek

Main settlement
Bottle Creek
Group
The Caicos Islands
Main towns
Bottle Creek, Kew, Whitby
Port
South Dock, Providenciales

Site conditions in North Caicos

What the site asks of your steel

Wind
Open north coast
Surge
Low ground and ponds
Air
Coastal salt
Access
Sea leg from Provo

Our design note. North Caicos needs villas, small resorts, schools and farm buildings. Light frames, galvanized steel and bundles sized for the ferry fit the island.

North Caicos at a glance

The ground, the work and the road in

Ground and climate

Low limestone with more soil and vegetation than the other islands, ponds and wetlands.

What gets built

Farming, small resorts, villas, schools and community services.

Getting steel there

By ferry or barge from Providenciales to Sandy Point.

Towns: Bottle Creek · Kew · Whitby · Sandy Point

Steel we recommend

What we fabricate for North Caicos

The three building types we are asked for most here, made in our own plant in Vietnam and shipped in erection order.

Resorts and villas

Resort blocks, villas, condominiums and restaurant roofs on the beach.

Multi-story steel buildings →

Farm and aquaculture buildings

Farm stores, packhouses and conch and fish processing sheds.

Agricultural steel buildings →

Schools, halls and shelters

Classrooms, community halls and sports buildings that double as hurricane shelters.

Sports facilities and arenas →

Contractors in North Caicos

You win the job in North Caicos. We fabricate the steel.

Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.

Q&A

Questions about steel in North Caicos

How does steel reach North Caicos?

By ferry or barge from Providenciales. We size bundles for the vessel.

Can you supply farm buildings?

Yes. Farm stores, packhouses and sheds with coatings for salt air.

The Caicos Islands

Other districts: the caicos islands

North Caicos, Middle Caicos and South Caicos with East Caicos: farms, caves, fishing and quiet settlements.

Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the code basis in force in the Turks and Caicos Islands. World Steel designs and fabricates the steel; the contractor erects it.

Contact World Steel · Turks and Caicos

Talk to us about steel for North Caicos

Send the drawings or the site, size and use. We design or detail the steel for North Caicos’s hurricane, surge and salt-air conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to South Dock, Providenciales. WhatsApp, email or a video call with our engineers, booked at an hour that suits Cockburn Town. Our contact page for Turks and Caicos has the ports, the local time and the form.