The grid
Six decisions behind a column grid
The grid is settled with your layout first, then the frame is designed for it.
Set by the racking
Column spacing follows rack depth and aisle width, so columns sit inside rack rows, not in aisles.
Dock doors on the frame lines
Dock door spacing along the walls is matched to the girt and column layout.
Repeat the same bay
One bay repeated across the building means fewer different pieces, simpler fabrication and faster erection.
Low-pitch roof
A very wide roof is kept at a low pitch, with the panel and drainage chosen for the long run to the eaves.
Sprinklers and services
Sprinkler mains, lights and ducts are carried as collateral loads, with hanger points planned on the rafters.
Expansion joints
Very long or wide buildings get expansion joints placed by design, so the frame can move with temperature.
Built for scale
Large, repeated packages are what our plant is set up for
Repeated members
Hundreds of identical columns and rafters run through our automated lines one after another.
Tracked by piece mark
Every member is followed in PEB Studio from cutting to shipping, so a big job stays visible.
Shipped in erection order
Bundles leave the plant in the order your crew will set the bays, not all at once.
- 5,000 tabout 5,500 short tonsSunpro Steel Factory
- 2,500 tabout 2,750 short tonsCPV Food Processing Factory
- 2,000 tabout 2,200 short tonsLong Son petrochemical complex
- 2,000 tabout 2,200 short tonsM&D (MD Factory)
Built by World Steel
Wide floors on slim interior columns



Honda Warehouse in the Philippines (2024): pre-engineered steel by World Steel. See the project
From our company profile
Multi-span frame - many interior columns
- Standard wall peak height: 3 m – 8 m (about 10 ft – 26 ft)
- Standard spacing between rigid frames: 7.5 m – 9 m (about 25 ft – 30 ft)
- Standard roof live load: 0.3 kN/m² (about 6 psf)
Standard values from the profile. Your building is designed for its own size and its US code loads.
Planning a distribution center? See warehouse and distribution buildings and cross-dock facilities.
Questions
Column-grid frame questions
How is the column grid of a distribution center chosen?
From the racking: rack depth, aisle width and the number of rows decide where columns can stand without blocking an aisle. Dock doors, sprinklers and the roof span are checked against that grid before the frame is designed.
Is a frame with many interior columns cheaper than a clear span?
For very wide buildings it usually uses much less steel, because each rafter spans only between columns. The saving is weighed against the columns on the floor, and we show both in design optimization.
How long and wide can one building be?
There is no fixed limit, but long and wide buildings are divided by expansion joints so the steel can move with temperature. Joint positions are set in design.
Can a large multi-span building go up in phases?
Yes. The frames can be designed so the building is extended later by adding bays or column lines, with the future connections shown on the drawings.
Can you handle the tonnage of a large distribution center?
Our plant fabricates 2,500 metric tons of structural steel a month, and our largest jobs reach 5,000 t. Large orders are fabricated and shipped in erection sequence.
Built for large jobs
Multi-span frames on a column grid for your next large package
Our own plant in Vietnam fabricates 2,500 metric tons of structural steel a month, is accredited under IAS AC472 since 2019 and is audited twice a year. Shop drawings are included on every project.
- 5,000 tSunpro Steel Factory
- 2,500 tCPV Food Processing Factory
- 2,000 tLong Son petrochemical complex
- 2,000 tM&D (MD Factory)
Request a quote
Send drawings, a model or a member schedule. Our engineers check the US code basis, size or verify the members and price the fabricated steel, delivered to your US port.
Become our partner in the US
You erect and own the customer; we design, fabricate and ship. Engineering support on your bids and supply under your brand.
Who approves the design. We prepare calculations and drawings ready for your Engineer of Record’s review and approval. The PE seal and the permit stay with the US contractor, our customer.
Shop drawings, included