The English company profile of World Steel Group (edition 2026 Q4, 56 pages). It covers the company history, vision and certificates (IAS AC472, ISO 9001, ISO 14001, ISO 45001, ISO 3834-2, EN 1090-1, AS/NZS 5131), solutions and products, the advantages and uses of steel structures, the technical specifications of our ten standard steel frame systems, roof and wall sheeting and accessories, design standards, the plant (20,000 m² and 2,500 metric tons of structural steel a month), its machines, the material grades we use, the fabrication and inspection flow chart, the quality inspection process and typical projects around the world.
- File
- PDF, 15.8 MB
- Pages
- 56
- Language
- English
- Category
- Brochures & catalogs
- Access
- Free download
Bidding a large US project?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.