Scope
Who makes what on a steel roof over concrete
World Steel supplies steel structure only. The concrete and the erection stay with the project team in the US.
Concrete columns, walls and footings
By othersDesigned by the project’s Engineer of Record, built by the US contractor or a concrete trade.
Anchor bolts and embed plates
CoordinatedLayout, size and projection given on our anchor bolt plan; supply as the contract states.
Steel rafters and connection plates
World SteelTapered rafters welded from plate, with bearing or end plates for the concrete heads.
Purlins, girts above the concrete, bracing
World SteelCold-formed secondary members and the bracing that carries wind along the building.
Roof and wall sheeting, trims, gutters
World SteelRoof panels and accessories engineered with the frame, when part of the package.
Erection of the steel
US contractorThe US contractor, our customer, sets the steel on the finished concrete.
Where the materials meet
Six points the interface design settles
Bearing point
Pinned or fixed at the column head, chosen with the concrete design, because it decides what forces the concrete must carry.
Tolerances
Concrete is built to looser tolerances than steel. Slotted holes, shims and grout pockets take up the difference.
Horizontal thrust
A gable rafter pushes outward under load. The concrete columns, a tie or the bearing detail must take that thrust.
Movement
Steel and concrete move differently with temperature. Long buildings get sliding bearings or joints where needed.
Bracing load path
Roof bracing delivers wind and seismic forces to the concrete. The connection and the concrete are checked for them.
Sequence
Anchor bolts are cast with the concrete, so the anchor bolt plan is released before the pour.
Anchor bolt plans and connection details come with our shop drawings, included on every project.
On site
Steel roofs set on concrete



Siam Lubric Warehouse in Thailand (2024): World Steel roof steel on concrete columns. See the project
From our company profile
Gable frame - exterior concrete columns
- Standard wall peak height: 3 m – 8 m (about 10 ft – 26 ft)
- Standard spacing between rigid frames: 7.5 m – 9 m (about 25 ft – 30 ft)
- Standard roof live load: 0.3 kN/m² (about 6 psf)
Standard values from the profile. Your building is designed for its own size and its US code loads.
Questions
Steel roof on concrete columns: questions
Why put a steel roof on concrete columns?
Concrete walls resist impact, fire and wear at floor level and may be built by a local trade, while a steel roof spans wide with little weight. The mix suits tilt-up, masonry and precast buildings that need a long-span roof.
Who designs the concrete columns?
The project’s Engineer of Record or the concrete designer. We give the loads, reactions and anchor bolt layout from the steel roof so the concrete can be designed for them.
Does World Steel supply the anchor bolts?
Anchor bolts can be part of our supply when the contract says so. Either way we issue the anchor bolt plan with sizes, positions and projection.
How do you handle concrete that is out of tolerance?
The bearing details use slotted holes, shim packs and grout pockets so the steel can be set true on concrete built to normal concrete tolerances. Large errors are fixed in the concrete before steel is set.
Can the steel roof push the concrete columns outward?
Yes, a gable rafter produces outward thrust. The connection is designed with the concrete engineer so the thrust is either carried by the columns, released at a sliding bearing or taken by a tie.
Built for large jobs
Steel roofs on concrete columns for your next large package
Our own plant in Vietnam fabricates 2,500 metric tons of structural steel a month, is accredited under IAS AC472 since 2019 and is audited twice a year. Shop drawings are included on every project.
- 5,000 tSunpro Steel Factory
- 2,500 tCPV Food Processing Factory
- 2,000 tLong Son petrochemical complex
- 2,000 tM&D (MD Factory)
Request a quote
Send drawings, a model or a member schedule. Our engineers check the US code basis, size or verify the members and price the fabricated steel, delivered to your US port.
Become our partner in the US
You erect and own the customer; we design, fabricate and ship. Engineering support on your bids and supply under your brand.
Who approves the design. We prepare calculations and drawings ready for your Engineer of Record’s review and approval. The PE seal and the permit stay with the US contractor, our customer.
Shop drawings, included