Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Steel frame systems · Multi-span frame with two interior columns

Two column lines, three bays, one wide roof

When a building gets wide, two lines of interior columns turn one long rafter into three short ones. The roof stays a single gable, the frame stays light, and the floor divides naturally into three bays: production in the middle and storage on each side, or a central truck aisle with racking left and right. We place the column lines with your layout, then design and fabricate the frame in our own plant.

Three bays · one ridge · one roof

Three bays

Pick a bay to see how it is often used

Cross-section of a three-bay building: side bay, center bay and side bay under one gable roof, divided by two interior columns

Side bay

Racking, raw material storage or a line of offices and amenities along the wall.

Center bay

The widest bay, under the ridge: production lines, a main aisle or the highest racking.

Side bay

Finished goods, staging at the dock doors, or a second process line.

Settled in design

What a two-column frame design decides

  • Bay widths

    The three bays need not be equal. Widths follow your layout, then the frame is sized for them.

  • One ridge, two slopes

    The roof remains a simple gable, so drainage stays at the two outer walls with no valley gutters.

  • Cranes per bay

    A crane can run in one bay or all three, with runways on the interior columns where the design allows.

  • Stability

    Interior columns are usually pinned, so the outer frame and bracing carry the sideways loads. That choice is made early.

Cranes in the bays? See plants with crane bays and crane runway girders.

Steel frames with two interior column lines being erected by crane

From our company profile

Multi-span frame - 2 interior columns

  • Standard wall peak height: 3 m – 8 m (about 10 ft – 26 ft)
  • Standard spacing between rigid frames: 7.5 m – 9 m (about 25 ft – 30 ft)
  • Standard roof live load: 0.3 kN/m² (about 6 psf)

Standard values from the profile. Your building is designed for its own size and its US code loads.

Built by World Steel

Wide frames on interior column lines

Blue steel frames of a wide warehouse with interior column lines during erection
Corner of a large steel frame with columns, rafters and bracing
Long line of erected steel frames on a warehouse site

Namyong Warehouse in Thailand (2024): pre-engineered steel by World Steel. See the project

Questions

Two interior columns: questions

When should I choose two interior column lines instead of one?

When the building is wide enough that even half the width is a long span, or when your floor already splits into three zones. We compare one, two and more column lines for your width and loads.

Must the three bays be the same width?

No. The column lines go where your layout needs them, for example a wide center bay for production and narrower side bays for storage.

Can each bay have its own crane?

Yes, if the cranes are known at design time. Runway beams can be carried on the interior columns or on separate crane columns, and the frame is sized for every crane load case.

Does a multi-span roof need valley gutters?

Not this frame. The roof stays one gable with a single ridge, so rain runs to the outer walls. Valley gutters belong to the multi-gable frame.

Are interior columns fixed or pinned?

Usually pinned top and bottom, which keeps them slim and their footings simple. The outer frames and bracing then carry the sideways loads.

Built for large jobs

Multi-span frames with two column lines for your next large package

Our own plant in Vietnam fabricates 2,500 metric tons of structural steel a month, is accredited under IAS AC472 since 2019 and is audited twice a year. Shop drawings are included on every project.

  • 5,000 tSunpro Steel Factory
  • 2,500 tCPV Food Processing Factory
  • 2,000 tLong Son petrochemical complex
  • 2,000 tM&D (MD Factory)
Our large-project program

Request a quote

Send drawings, a model or a member schedule. Our engineers check the US code basis, size or verify the members and price the fabricated steel, delivered to your US port.

Become our partner in the US

You erect and own the customer; we design, fabricate and ship. Engineering support on your bids and supply under your brand.

Who approves the design. We prepare calculations and drawings ready for your Engineer of Record’s review and approval. The PE seal and the permit stay with the US contractor, our customer.

Shop drawings, included