Anatomy
How an arched roof truss is put together
Top chord
Curved to the roof line. Carries compression and supports the purlins.
Web members
Diagonals and verticals that carry shear between the chords. Their layout is drawn with the purlin points.
Bottom chord
Follows the arc below the top chord. Often in tension, and braced against buckling under uplift.
Bolted splices
Long trusses ship in segments joined by bolted splices, match-marked for assembly on site.
Built-up columns
Exterior columns welded from plate, sized for the vertical load, wind and any arch thrust.
Bracing
Roof and wall bracing hold the trusses upright and carry wind along the building.
The exterior columns are box or I-shaped built-up sections; for solid curved beams instead of trusses see curved and cambered members.
Why an arched truss
Long, light and roomy under the roof
Steel goes where it works
An open web puts steel in the chords, where it carries the bending, and very little in between.
Room inside the roof
Ducts, pipes, cable trays and lights run through the truss depth instead of below it.
A roofline people remember
The curve gives a hall, a market or a sports building a profile a straight rafter cannot.
Shaped for the loads
The arc rise is chosen with the snow, wind and drainage at your site, not only for looks.
Large-project reference
CPV Food: a roof of arched trusses
2,500 tabout 2,750 short tons of structural steel
A food processing plant in Dong Nai Province, Vietnam, completed in 2020 with World Steel’s design, fabrication and supply of the steel structure.




CPV Food Processing Factory, Dong Nai Province, Vietnam (2020): about 2,500 t (2,750 short tons) of World Steel structural steel. See the project
From our company profile
Arched roof truss - exterior built up steel columns
- Standard wall peak height: 3 m – 8 m (about 10 ft – 26 ft)
- Standard spacing between rigid frames: 7.5 m – 9 m (about 25 ft – 30 ft)
- Standard roof live load: 0.3 kN/m² (about 6 psf)
Standard values from the profile. Your building is designed for its own size and its US code loads.
Questions
Arched roof truss questions
What is the difference between an arched truss and a curved rafter?
A curved rafter is a solid welded beam with a curved web. An arched truss is an open frame of curved chords and diagonals. Trusses are usually lighter for long spans; curved rafters are simpler and shallower for moderate spans.
Do arched trusses push the columns outward?
An arch can produce horizontal thrust at its supports. Depending on how the truss is supported, that thrust is carried by the columns, by a tie or released at the bearing. It is part of the column and foundation design.
How are long trusses shipped to the US?
In segments joined by bolted splices, each sized for a container, flat rack or breakbulk slot, match-marked and labeled by piece mark for assembly on site.
Can services hang from the trusses?
Yes, when the hung loads are known at design time. Sprinklers, ducts, lights and process equipment are included as collateral or hung loads and attached at panel points.
Are the exterior columns rolled or built-up?
Built-up, welded from plate in our plant, so their depth and plate sizes match the load and the arch thrust. See our built-up steel sections pages for how they are made.
Built for large jobs
Arched roof trusses for your next large package
Our own plant in Vietnam fabricates 2,500 metric tons of structural steel a month, is accredited under IAS AC472 since 2019 and is audited twice a year. Shop drawings are included on every project.
- 5,000 tSunpro Steel Factory
- 2,500 tCPV Food Processing Factory
- 2,000 tLong Son petrochemical complex
- 2,000 tM&D (MD Factory)
Request a quote
Send drawings, a model or a member schedule. Our engineers check the US code basis, size or verify the members and price the fabricated steel, delivered to your US port.
Become our partner in the US
You erect and own the customer; we design, fabricate and ship. Engineering support on your bids and supply under your brand.
Who approves the design. We prepare calculations and drawings ready for your Engineer of Record’s review and approval. The PE seal and the permit stay with the US contractor, our customer.
Shop drawings, included