Steel frame systems · Multi-gable frame

Multi-gable frames: a wide building under several smaller roofs

A multi-gable frame sets two or more gable roofs side by side, each with its own ridge, sharing a column line at every valley. Rafters stay short, ridges stay low, and a very wide plant can sit under a roof that never gets tall. Because each gable is a module, the building can also grow one roof at a time. We design the frame and the valley drainage together and fabricate it in our plant in Vietnam.

The valley

Where two roofs meet, the design does the most work

Valley gutter

Each valley collects rain from two roofs. Gutter size, outlets and overflow follow the local rainfall intensity.

Valley column

The shared column under the valley carries both rafters and often the gutter support.

Valley detail: two roof slopes meeting over a valley gutter carried on the shared interior column RAIN FROM TWO ROOFS

Snow in the valley

Snow drifts into valleys. ASCE 7 valley and drift loads are added where your site sees snow.

Access and upkeep

Valleys need cleaning. Walkways or access points are planned into the roof layout.

Want one ridge and no valleys? Compare a multi-span frame with two interior columns.

Grow by module

Build one roof now, add the next one later

Start with one gable

Build the first module with its outer wall designed as a future valley.

Add the next

The next gable bolts to the shared column line, with the valley gutter fitted at the joint.

Keep going

Each module repeats the same frame, so later phases fabricate quickly from the same drawings.

Large-project reference

M&D Warehouse: about 2,000 t of World Steel framing

Aerial view of two red steel frame blocks under erection
Red steel frames of a large warehouse seen from the air
Red steel warehouse frames on a large site, drone view
Wide aerial of red steel frames and the surrounding site

M&D Warehouse in Thailand (2024): about 2,000 t (2,200 short tons) of World Steel structural steel. See the project

Twin gable steel frames side by side on an open site

From our company profile

Multi-gable frame

  • Standard wall peak height: 3 m – 8 m (about 10 ft – 26 ft)
  • Standard spacing between rigid frames: 7.5 m – 9 m (about 25 ft – 30 ft)
  • Standard roof live load: 0.3 kN/m² (about 6 psf)

Standard values from the profile. Your building is designed for its own size and its US code loads.

Questions

Multi-gable frame questions

What is the difference between a multi-gable and a multi-span frame?

A multi-span frame keeps one ridge and one roof with interior columns under it. A multi-gable frame has several ridges and valleys, one gable per module, with columns at each valley.

Why choose several gables instead of one wide roof?

Shorter rafters, a lower overall roof height and the option to build in phases. The trade-off is valley gutters, which need careful design and regular cleaning.

Are valley gutters a leak risk?

They are the part of the roof that needs the most attention. We size them for the rainfall, add overflow, and detail laps and outlets on the shop drawings so they can be built right and maintained.

Can I add another gable later?

Yes, if it is planned. The outer column line is designed as a future valley, so a new gable can be bolted on with the gutter fitted at the joint.

Do multi-gable buildings work in snow country?

Yes, with snow drift in the valleys included in the design. ASCE 7 sets the valley and drift loads, and the frame, purlins and gutters are sized for them.

Built for large jobs

Multi-gable frames for your next large package

Our own plant in Vietnam fabricates 2,500 metric tons of structural steel a month, is accredited under IAS AC472 since 2019 and is audited twice a year. Shop drawings are included on every project.

  • 5,000 tSunpro Steel Factory
  • 2,500 tCPV Food Processing Factory
  • 2,000 tLong Son petrochemical complex
  • 2,000 tM&D (MD Factory)
Our large-project program

Request a quote

Send drawings, a model or a member schedule. Our engineers check the US code basis, size or verify the members and price the fabricated steel, delivered to your US port.

Become our partner in the US

You erect and own the customer; we design, fabricate and ship. Engineering support on your bids and supply under your brand.

Who approves the design. We prepare calculations and drawings ready for your Engineer of Record’s review and approval. The PE seal and the permit stay with the US contractor, our customer.

Shop drawings, included