Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

St. James parish · Jamaica

Steel buildings and structural steel for St. James, Jamaica

St. James is home to Montego Bay, Jamaica’s second city, its international airport, freeport and free zone, and the resort strip from Ironshore to Rose Hall.

County of Cornwall · Parish seat Montego Bay

Site conditions in St. James

What the site asks of your steel

Wind
North coast hurricane exposure
Air
Salt on the bay and resorts
Ground
Reclaimed land near the bay
Slopes
Wind speed-up on the hills

Our design note. Montego Bay’s steel goes into resorts, free zone buildings, airport facilities and logistics. Steel lands right at the city’s freeport, and coastal coatings plus hurricane design are standard on almost every site.

St. James at a glance

The ground, the work and the road in

Ground and climate

Coastal flats and reclaimed land around the bay, rising to steep hills behind the city.

What gets built

Tourism and resorts, business process outsourcing in the free zone, airport and logistics, retail and housing.

Getting steel there

Montego Bay freeport in the city; Sangster International Airport; three hours from Kingston by road.

Towns: Montego Bay · Ironshore · Rose Hall · Cambridge

Steel we recommend

What we fabricate for St. James

The three building types we are asked for most in this parish, made in our own plant in Vietnam and shipped in erection order.

Hotels and resort buildings

Multi-storey steel frames and long-span roofs for resorts and attractions.

Multi-story steel buildings →

Warehouses and logistics

Clear-span distribution buildings with dock doors and mezzanines.

Warehouse and distribution buildings →

Hangars and long spans

Long-span frames for hangars, terminals, arenas and showgrounds.

Aircraft hangar buildings →

Contractors in St. James

You win the job in St. James. We fabricate the steel.

Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.

Q&A

Questions about steel in St. James

Can steel be shipped straight to Montego Bay?

Yes. The Montego Bay freeport suits western sites and avoids the long haul from Kingston.

Do you supply hangars and airport buildings?

Yes. Long-span frames for hangars, terminals and support buildings.

County of Cornwall

Other parishes in Cornwall

The west: Montego Bay, Negril, sugar plains and the south coast.

Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the Jamaica National Building Code. World Steel designs and fabricates the steel; the contractor erects it.

Contact World Steel · Jamaica

Talk to us about steel for St. James

Send the drawings or the site, size and use. We design or detail the steel for St. James’s wind, seismic and coastal conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to Montego Bay. WhatsApp, email or a video call with our engineers, booked at an hour that suits Kingston. Our contact page for Jamaica has the ports, the local time and the form.