Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Hanover parish · Jamaica

Steel buildings and structural steel for Hanover, Jamaica

Hanover, between Montego Bay and Negril, has grown into a major resort parish while keeping small towns like Lucea and farmland in its hills.

County of Cornwall · Parish seat Lucea

Site conditions in Hanover

What the site asks of your steel

Wind
North-west coast exposure
Air
Salt along the resorts
Rain
Heavy in the hills
Seismic
Moderate

Our design note. Hanover’s resort projects are among the largest buildings in western Jamaica. Multi-storey steel frames, long-span roofs and service buildings, all with coastal coatings, are typical.

Hanover at a glance

The ground, the work and the road in

Ground and climate

A narrow coastal strip and harbours under green hills; river valleys inland.

What gets built

Large resorts, tourism services, farming and fishing, and housing for resort workers.

Getting steel there

About an hour from the Montego Bay port along the north coast road.

Towns: Lucea · Hopewell · Green Island · Sandy Bay

Steel we recommend

What we fabricate for Hanover

The three building types we are asked for most in this parish, made in our own plant in Vietnam and shipped in erection order.

Hotels and resort buildings

Multi-storey steel frames and long-span roofs for resorts and attractions.

Multi-story steel buildings →

Schools, churches and halls

Classrooms, sports halls, churches and community buildings.

Community and recreation halls →

Agricultural buildings

Packing houses, barns, feed stores and sheds for farms and estates.

Agricultural steel buildings →

Contractors in Hanover

You win the job in Hanover. We fabricate the steel.

Bid with our drawings, our capacity and live tracking behind you. You run the site and erect; we design, detail, fabricate and ship. Win-win, job after job.

Q&A

Questions about steel in Hanover

Do you supply steel for large resorts in Hanover?

Yes. Multi-storey frames, ballrooms, back-of-house buildings and staff housing, shipped through Montego Bay.

What coating suits a beachfront resort?

A high-build epoxy system or galvanizing for exposed steel, chosen with your engineer for the exposure.

County of Cornwall

Other parishes in Cornwall

The west: Montego Bay, Negril, sugar plains and the south coast.

Site conditions on this page are general notes for planning. Your engineer of record confirms the wind, seismic, flood and soil values for your site under the Jamaica National Building Code. World Steel designs and fabricates the steel; the contractor erects it.

Contact World Steel · Jamaica

Talk to us about steel for Hanover

Send the drawings or the site, size and use. We design or detail the steel for Hanover’s wind, seismic and coastal conditions, and quote it made in our plant in Vietnam, packed in erection order and shipped to Montego Bay. WhatsApp, email or a video call with our engineers, booked at an hour that suits Kingston. Our contact page for Jamaica has the ports, the local time and the form.