Your matched steel package
Transportation & Infrastructure
Treat these as a first pass pulled from our reviewed engineering content. Your Engineer of Record confirms the structural design, and your local building department decides on code compliance and the permit.
Framing approaches to consider
- Prefabricated bridge modules
- Built-up steel members
- Structural steel fabrication
- Hot-dip galvanizing
Points your engineer will check
Module lengths and splice locations are set by container, flat-rack and highway permit limits as well as by the structure.
From: Transportation & Infrastructure
Galvanizing kettle size can cap member length, so it is checked before detailing.
From: Transportation & Infrastructure
DOT and transit-agency work follows the owner’s design criteria, and federally funded work may carry steel sourcing rules to confirm with the funding agency.
From: Transportation & Infrastructure
Components to include
Coating and corrosion options
Systems in scope
Services that apply
Guides to read next
Comparable buildings
What happens next
- Share drawings, a sketch or simply the footprint and ZIP code.
- We agree the design loads with your Engineer of Record and draft a package scope.
- You get a written proposal listing what is in, what is out and the Incoterm.
Adjust your answers
Bidding a large US project?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.