Fleet maintenance depots: bays wide enough for the fleet

A bus or truck depot is a row of service bays under one clear-span roof, with a crane or hoists over the bays, pits or lifts in the floor, a wash bay, a parts store and parking for the fleet outside. Doors are big and the roof carries cranes, fans and exhaust. Our plant fabricates 2,500 t of structural steel a month, so a depot and its canopies can run as one order.

Aerial view of a finished 36 by 114 m clear-span steel building with an office front in Thailand, steel by World Steel
WORK ORDER · DEPOT FRAMEClear span over the bays. Crane runways, door framing and roof fan supports drilled in the shop.

Layers of a depot

Switch on what the frame has to carry

Tick a layer to draw it on the plan. Each one changes the steel: crane runways, column spacing, roof openings or door framing.

WASH PARTSSTORE SERVICE BAYS FLEET PARKING CANOPY CRANE

Room by room

The parts of a depot, and the steel in each

Wash bay

A wet bay with the coating chosen for constant spray and detergents, and the frame kept out of the splash zone where it can be.

Epoxy coatings →

Parts store and mezzanine

A store for tyres, filters and parts, often with a mezzanine for offices and training above it.

Steel mezzanine frames →

From our project files

A 36 × 114 m clear span in Thailand

A clear-span building with no interior columns and an office at the front: the same frame a row of drive-through service bays needs. We have no bus depot reference yet.

Workshops with office
Inside the 36 by 114 m clear-span steel building in Thailand, blue frames with no interior columns Photo
Long view down the clear-span building in Thailand under blue steel frames and a light roof Photo
Blue steel frames and purlins of the 36 by 114 m building in Thailand during erection Photo
Aerial view of the finished clear-span steel building with its front office in Thailand Photo

Scope, in writing

What we supply and what stays with your team

World Steel, our plant in Vietnam

  • Depot frame, crane runways, mezzanines, door framing, roof equipment steel and fleet canopies designed to the contract documents
  • Coating systems for wash bays and exhaust, from paint systems to galvanizing by an outside galvanizer in Vietnam
  • Shop and erection drawings at no extra cost, ready for your Engineer of Record
  • Fabrication in our IAS AC472-accredited plant in Vietnam, tracked live in PEB Studio

The US contractor, our customer

  • Drawing approval, the PE seal and the permit with your Engineer of Record
  • Pits, lifts, exhaust extraction, fuel, lubrication and charging equipment
  • Slab, foundations, drainage and oil separators
  • Erection, envelope, doors, building services and fit-out

Questions from US contractors

Fleet maintenance depot steel: questions and answers

6 answers, grouped by topic.

Depot buildings 3 answers

How wide and long can a service bay be?

The frame is designed for the vehicles and the bay layout the owner sets, with clear spans that keep columns out of the bays. We have fabricated clear-span buildings 36 m wide and 114 m long.

Can the frame carry cranes over the bays?

Yes. Crane runways and crane columns, or monorails for lighter lifts, are designed and fabricated with the frame. The crane itself can come from us or the crane maker.

Do you supply the lifts and exhaust systems?

No. Lifts, pits, exhaust extraction and fuel or charging equipment come from their suppliers. We frame the roof openings and supports they need.

Fleets and programs 3 answers

Can fleet parking canopies come with the depot?

Yes. Portal canopies over the parked fleet can ship with the building, designed for solar panels and charging cable routes where the owner wants them.

Do you have a bus depot reference?

Not a bus depot yet. Our references are clear-span buildings, crane buildings and workshops fabricated in our plant, such as the 36 by 114 m building in Thailand on this page.

Can several depots run as one program?

Yes. The plant fabricates 2,500 t of structural steel a month, so depots for several sites of a fleet operator can be fabricated together and shipped site by site.

Keep reading

Related pages

Price it or partner with us

Send the depot layout and the fleet.

Share the bays, the vehicles, the cranes and the canopies you need. We will price the depot and the parking canopies together.

Why US contractors price with us

2,500 t / month

Own plant capacity, about 2,750 short tons

IAS AC472

Accredited since 2019, audited twice a year

Up to 5,000 t

Largest single job: Sunpro Steel, 2024

See our largest jobs →

Short project form

Tell us about the building

Ask an engineer directly, or drop the basics below. You get a written scope of supply for a US-code building, checked by engineering first.

Or call +84 902 881 833

Or leave your project details