
Processes
Three welding methods, one standard of care
IAS AC472 accredited since 2019
Audited twice a year by IAS experts. Remote inspector access on request.
Why it pays
Better welds, faster sites
Controlled conditions
Under cover, in the flat.
Qualified procedures
Every weld to a procedure.
Bolt-only site work
Faster, safer erection.
Inspected
Before it leaves the plant.
How it is done
Procedure, weld, inspect
- Procedures setFor each joint type.
- WeldedBy qualified welders.
- InspectedVisual and NDT as specified.
- ShippedWith records.
Photo
PhotoSpecification
Shop welding at a glance
- Processes
- Submerged arc, flux-cored and gas metal arc welding
- Procedures
- Qualified welding procedures and qualified welders
- Seismic work
- AWS D1.8-qualified procedures and welders available
- Inspection
- Visual inspection; NDT as the project specifies
- Plant
- IAS AC472 accredited since 2019, audited twice a year
- Remote access
- Inspector access by video on request
Photo
Photo
AWS D1.1 and D1.8
Qualified procedures and welders, records with every shipment
Where it goes
Welded assemblies across the building
Questions
Welding questions
Are your welders qualified for US work?
Welding is done under qualified procedures by qualified welders, and AWS D1.8-qualified procedures and welders are available for seismic work. Project requirements are confirmed in the proposal.
Can our inspector check the welds?
Yes. Remote inspector access by video is available on request, and your inspector can visit the plant.
What does IAS AC472 mean?
It is an accreditation for structural steel fabricators. Our plant has held it since 2019 and is audited twice a year by IAS experts.
More connections and anchorage: Anchor Bolts · Structural Bolts · Base Plates · Gusset Plates · Connection Plates · Brackets · Cleats · Stiffeners
Next step
Price it, or build with us for the long run
Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.
Request a quote for Welding Assemblies
Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.
Become our partner in the US
Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.
Photo
Catalog record Verified
Sized by our engineers for your loads and code, then listed line by line in your quote.
Related solutions
Covered in our state guides