Why World Steel
One-off steel from a plant built for volume
Built to your drawings
We fabricate your design as drawn, or detail it from your Engineer of Record’s design.
Heavy fabrication in-house
Beam lines, cranes and welding stations sized for large members.
Witness it remotely
Hold points can be witnessed live on video or by your inspector.
Documented end to end
Every assembly ships with its records.
Specification
What we take on
- Scope
- Defined job by job from your drawings or design
- Fabrication
- Cutting, fitting, submerged-arc and manual welding to AWS D1.1
- Inspection
- To your inspection and test plan, with NDT and third-party witness on request
- Trial assembly
- Shop trial fit of critical assemblies where the job requires it
- Records
- Mill certificates, weld maps, dimensional and coating reports
- Packing
- Custom cradles, bracing and lifting points for transport
How it works
Drawings in, inspected steel out
- Drawings and requirementsYour drawings, specifications and inspection plan.
- Shop detailingShop drawings for your review before cutting.
- Fabrication and trial fitAssembled and checked in the shop.
- Custom packingCradles and bracing for the voyage.
Where it goes
Projects that need steel no catalog has
Questions
Custom fabrication questions
Can you fabricate to someone else’s design?
Yes. Under our flexible supply option we fabricate a stamped design as drawn; your Engineer of Record remains responsible for it.
What kinds of assemblies do you take on?
Plate girders, equipment frames, process towers, modular frames and other heavy plant steel. Send drawings and we confirm what fits our shop.
Can our inspector witness fabrication?
Yes, in person at the plant, by your third-party inspector, or live on video at the hold points you choose.
How are large assemblies shipped?
Split at bolted splices where possible, or packed on custom cradles with lifting points, and shipped from Vietnam to your US port.
More primary structure: Pre-Engineered Metal Buildings · Rigid Frame Systems · Built-Up Steel Columns · Built-Up Steel Rafters · Tapered Frames · Hot-Rolled Structural Members · Steel Trusses · Long-Span Steel Structures
Next step
Price it, or build with us for the long run
Every item comes from a plant that fabricates 2,500 metric tons of structural steel a month, accredited under IAS AC472 since 2019, with shop drawings included.
Request a quote for Special Structural Assemblies
Send your drawings, loads or a simple list. Our engineers take off the quantities, check the US code basis and price exactly the scope you need, one item or the whole steel package.
Become our partner in the US
Contractors who bid steel often partner with World Steel: engineering support on your bids, OEM and private-label supply under your brand, and one fabricator behind every job you win. You erect and own the customer; we design, fabricate and ship.
Photo
Catalog record Verified
Sized by our engineers for your loads and code, then listed line by line in your quote.