MRO and maintenance shops

MRO and maintenance shops: a clear span with a workshop behind it

An MRO hangar is a clear-span bay big enough for the aircraft and its stands, a door the full width of the wings, and a strip of back shops along the side. Our plant fabricates 2,500 t of structural steel a month, so a hangar bay, its back shops and its apron canopies ship from one fabricator.

Maintenance log · what the building gives

  • Line checks and inspectionsShort visits: a bay near the door, good light and power at the stands.
  • Heavy checksWeeks in the bay: docks around the fuselage, cranes or hoists over engines and gear.
  • Engine changesA hoist or crane over the engine position, with the load hung from the roof steel.
  • Paint and stripA separate, ventilated bay with its own fire and exhaust design.
  • Parts and storesA mezzanine or a side building for rotables, tooling and records.

Large-project capacity

A hangar bay, its back shops and canopies, from one plant

World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so the steel package of a large US job runs as one order.

2,500 metric tons a month

Hangar plan

Four parts of an MRO hangar, four jobs for the steel

Tap a part of the plan to jump to what its steel does.

Hangar door

A full-width door hangs from a deep header truss or girder. Its deflection limit comes from the door maker and sets the header size.

Door frames →

Clear-span bay

Trusses or deep rafters span the wings with no column on the floor. The tail height sets the clear height under the roof steel.

Long-span steel structures →

Roof-hung equipment

Hoists, fall-arrest lines, lights and fire-protection mains hang from the roof, and their loads are in the truss design from the start.

Steel trusses →

Back shops

A lean-to or two-storey strip along the side for avionics, wheels and brakes, composites, stores and offices.

Steel mezzanine frames →

Before the roof is sized

Three things to settle with the door maker and the fire engineer

Fire protection by others

Hangar fire protection follows NFPA 409 and is designed by the fire protection engineer. We frame the roof for the foam and sprinkler mains they specify.

Wind on an open door

A hangar is checked with its door open as well as shut, so the frame carries the wind with one wall missing.

Truss depth and clear height

Deep trusses save steel but eat clear height. Tail height and dock heights are agreed before the roof is sized.

From our project files

Aircraft hangar, Thailand: about 200 t

A hangar needs very wide clear spans and a large door, a demanding test of a steel frame. We fabricated about 200 t for this one in 2018, with long rafters made, marked and shipped from our plant.

See the hangar project
Fabricated hangar members with end plates in the World Steel plant Photo
Long hangar rafters laid out in the World Steel plant before painting Photo
Looking up at curved steel roof trusses spanning a wide hall Photo
Large insulated sectional door seen from inside a steel building Photo

Scope, in writing

What we supply and what stays with your team

World Steel, our plant in Vietnam

  • Frame, roof truss, door header and back-shop steel designed to the contract documents
  • Hanger points for hoists, fall-arrest and fire-protection mains in the roof design
  • Shop and erection drawings at no extra cost, ready for your Engineer of Record
  • Fabrication in our IAS AC472-accredited plant in Vietnam, tracked live in PEB Studio

The US contractor, our customer

  • Drawing approval, the PE seal and the permit with your Engineer of Record
  • Hangar doors, fire protection to NFPA 409 and their specialist designers
  • Apron, floor slab, trenches and airport approvals
  • Erection, cladding, docks and fit-out

Questions from US contractors

MRO hangar steel: questions and answers

6 answers, grouped by topic.

The hangar bay 3 answers

How wide a clear span can an MRO hangar have?

Spans for narrow-body aircraft and larger are reached with steel trusses or deep built-up rafters. The span is set from the wingspan, the clearances and the stands, then checked by your Engineer of Record.

Can the roof carry hoists and fall-arrest systems?

Yes, when the loads and positions are given before design. Hoists, fall-arrest lines and fire-protection mains are hung from points we design into the trusses.

Do you have a hangar reference?

Yes. We fabricated about 200 t of steel for an aircraft hangar in Thailand in 2018, with long rafters made and marked in our plant.

Doors and fire 3 answers

How is the hangar door header designed?

From the door maker’s weights, guide loads and deflection limit. The header truss or girder is sized so the door keeps running when the roof is loaded.

Do you design hangar fire protection?

No. Fire protection follows NFPA 409 and is designed by a fire protection engineer. We frame the roof and openings for the system they specify.

How big an MRO project can you supply?

The plant fabricates 2,500 t of structural steel a month, so a multi-bay MRO hangar with back shops can run as one order.

Keep reading

Related pages

Price it or partner with us

Send the aircraft, the door and the back-shop list.

Share the design aircraft, the door type and the shops you need along the bay. We will price the hangar frame, the door header and the back shops.

Why US contractors price with us

2,500 t / month

Own plant capacity, about 2,750 short tons

IAS AC472

Accredited since 2019, audited twice a year

Up to 5,000 t

Largest single job: Sunpro Steel, 2024

See our largest jobs →