Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Shop crew in safety gear among rows of painted steel members

Members coated and staged inside a World Steel fabrication hall, Vietnam.

Industry intelligence engine

Steel recommendations for your project

Matched to the industry, building type, US region and priorities you chose. Each item explains why it made the list.

Your matched steel package

Aviation & Aerospace Facilities

Treat these as a first pass pulled from our reviewed engineering content. Your Engineer of Record confirms the structural design, and your local building department decides on code compliance and the permit.

Framing approaches to consider

  • Long-span rigid frames
  • Custom roof trusses
  • Door header assemblies
  • Bolted moment connections

Points your engineer will check

  • Wingspan, tail height and the clear door opening fix the span and eave before any steel is sized.

    From: Aviation & Aerospace Facilities

  • The header above a bifold or hydraulic door is designed with the door manufacturer’s loads and deflection limits.

    From: Aviation & Aerospace Facilities

  • Hangar fire protection (NFPA 409) can affect roof framing and drainage; your fire protection engineer confirms the requirements.

    From: Aviation & Aerospace Facilities

Components to include

Coating and corrosion options

Systems in scope

Services that apply

Guides to read next

Comparable buildings

What happens next

  1. Share drawings, a sketch or simply the footprint and ZIP code.
  2. We agree the design loads with your Engineer of Record and draft a package scope.
  3. You get a written proposal listing what is in, what is out and the Incoterm.
Adjust your answers
Select your industry *
Your priorities

Bidding a large US project?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.