Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Welder beside a deep built-up girder running through the automatic line

A deep plate girder going through automatic welding at World Steel, Vietnam.

Drawing review

Upload the drawings. An engineer reads every sheet.

Permit set, IFC model or a sketch on letterhead: a World Steel engineer checks it against your US code basis and replies with the scope of supply and a quote for the steel.

Drawing review · World Steel engineering

Read inSAP2000 · Tekla

Checked toYour code basis

ReturnedScope + quote

Approved byYour EOR

Formats: PDF · DWG · DXF · IFC · ZIP · XLSX

I have drawings

Fields marked * are required. It takes a few minutes.

From your industry selection: Aviation & Aerospace Facilities
You and your company
The project
Scope requested
Message and files

Products in your request

VICTOR Dang, Global Sales Director, World Steel Group

Your direct line at World Steel

VICTOR Dang

Global Sales Director, World Steel Group

View Victor’s profile

Any drawing stage

Wherever your drawings are, we start from there

Pick the stage in the form. The scope we return fits it: a framing proposal for a concept, a take-off for a permit set, detailing for an IFC set.

  1. ConceptSketches or a footprint. We propose a framing scheme and the steel it needs.
  2. Permit setStamped or near-final drawings. We take off and price them as drawn.
  3. Issued for constructionFinal design. We price, then detail it in Tekla Structures.
  4. Shop drawingsAlready detailed. We fabricate to your shop drawings or re-detail them.
Stiffened heavy plate girders resting on shop supports

What our engineer checks

Every sheet read against your US code basis

  • Geometry and grids

    Spans, bay spacing, heights and grid lines read into one model.

  • Loads and code basis

    Code edition, wind, snow, seismic and collateral loads noted for the record.

  • Connections

    Bolted and welded connections reviewed for fabrication and shipping.

  • Coating

    Surface preparation and coating system matched to the exposure.

We price your design as drawn. Ideas to save steel come as options for your Engineer of Record to approve, never as silent changes.

Before you send

Questions contractors ask first

Something else? Write it in the message box and an engineer answers with your quote.

Which file formats can I send?

PDF, DWG, DXF, IFC, ZIP, XLSX, XLS, CSV, DOCX, JPG and PNG, up to 10 files of 50 MB each. For larger models, send what you can and we arrange a transfer.

Will you change our engineer’s design?

Not without approval. We price the design as drawn. If we see steel or freight to take out, we write it up as an option for your Engineer of Record to accept or decline.

Who seals the final drawings?

Your Engineer of Record. World Steel prepares calculations and drawings ready for your engineer’s review and approval; the seal and the permit stay with the US contractor, our customer.